1 |
Paul W. Parfomak, Robert Pirog, Linda Luther, Adam Vann, "Keystone XL Pipeline Project," Congressional Research Service, Vol. 7-5700, 2013.
|
2 |
Ohashi, T. and Hayashi, K., "Lateral Extrusion of A6063 Aluminum Alloy Pipes," Journal of Materials Processing Technology, Vol. 138, pp. 560-563, 2003.
DOI
|
3 |
Yuan, S.J., Xu, Z., Wang, Z.R. and Hai, W., "The Integrally Hydro-forming Process of Pipe Elbows," International Journal of Pressure Vessels and Piping, Vol. 75, pp. 7-9, 1998.
DOI
|
4 |
Kim, T. G., Park, Y. C., Park, K. Y., "Determination of Forming Conditions of Fitting Pipes using Press Forming Processes," J. of KSMPE, Vol. 11, No. 1, pp. 101-106, 2012.
|
5 |
Cho, J. U., Han, m. s., "Durability Evaluation by Strength due to Load Direction of Press in Common Use," J. of KSMPE, Vol. 12, No. 6, pp. 52-59, 2013.
|
6 |
Akkus, N., Manabe, K., Kawahara, M. and Nishimura H., "A Finite-element Model for the Superplastic Bulging Deformation of Ti-alloy pipe," Journal of Materials Processing Technology, Vol. 68, pp. 215-220, 1997.
DOI
|
7 |
Park, Rebelo, N. and Kobayashi, S., "A new approach to preform design in metal forming with the finite element method," Int. Mach. Tool Des. Res, Vol. 23, No. 1, pp. 71-79, 1983.
DOI
|