Browse > Article
http://dx.doi.org/10.5139/JKSAS.2015.43.4.349

Research/Development Trend and Technical Enablers of Trajectory-based Operations in Air Traffic Management  

Eun, Yeonju (Korea Aerospace Research Institute)
Jeon, Daekeun (Korea Aerospace Research Institute)
Publication Information
Journal of the Korean Society for Aeronautical & Space Sciences / v.43, no.4, 2015 , pp. 349-358 More about this Journal
Abstract
The research and development trend of Trajectory-based Operations(TBO), which is considered as a key concept of future Air Traffic Management(ATM), is presented in this paper. The operational concepts of TBO in ASBU(Aviation System Block Upgrade) from ICAO(International Civil Aviation Organization) have been summarized, and the detailed operational concepts and procedures, which can be realized in the near future, are described through the investigations of operational concept development and related research/development activities of TBO in USA and Europe. The technical enablers, which have been identified based on understanding of TBO operational concepts, are introduced, and related research/development status of each technical enabler has been presented.
Keywords
TBO(Trajectory-based Operations); ATM(Air Traffic Management); 4D Trajectory; ASBU(Aviation System Block Upgrade); SESAR(Single European Sky ATM Research);
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Torres, S., Kloster, J. K., Ren, L., and Castillo- Effen, M., Trajectory Synchronization Between Air and Ground Trajectory Predictors, 30th IEEE/AIAA Digital Avionics Systems Conference(DASC), Seattle, WA, October 2011.
2 Korea Tranasport Institute, Master Plan for the Implementation of Aviation System Block Upgrade - Final Report, April 2014.
3 ICAO(International Civil Aviation Organization), Working Document for the Aviation System Block Upgrades - The Framework for Harmonization, March 2013.
4 ICAO(International Civil Aviation Organization), Working Document for the Aviation System Block Upgrades - The Framework for Harmonization, Ed. 2, Ver. 3, November 2011.
5 JPDO(Joint Planning and Developement Office), JPDO Trajectory-based Operations (TBO) Study Team Report, December 2011.
6 Ashford., R, NextGen Trajectory-based Operations Status Update, Environmental working Group Operations Standing Committee, May 2010.
7 Jackson, M.R.C., O'Laughlin, B.E., Airborne Required Time of Arrival Control and Integration with ATM, 7th AIAA Aviation Technology, Integration and Operations conference, Belfast, NI, 2007.
8 Mueller, E., McNally, D., Rentas, T., Aweiss, A., Thipphavong, D., Gong C., Cheng, J., Walton, J., Walker, J., Lee, C.H., Sahlman, S., Controller and Pilot Evaluation of a Datalink-Enabled Trajectory-based Operations Concepts, 9th USA/Europe Air Traffic Management Research and Development Seminar (ATM 2011), Berlin, Germany, June 2011.
9 Torres, S., Swam Theory Applied to Air Traffic Flow Management, Procedia computer Science 12 (2012) 463-470.   DOI
10 NASA, Air Traffic Management(ATM) Technology Demonstration - 1 (ATD-1) : Interval Management - Terminal Area Precision Scheduling and Spaing (IM-TAPSS), Fact Sheet, January 2012.
11 SESAR, European ATM Master Plan, 2nd Edition, October 2012.
12 Swenson, H.N., Thipphavong, J., Sadovsky, A., Design and Evaluation of the Terminal Area precision Scheduling and Spacing System, 9th USA/Europe Air Traffic Management Research and Development Seminar (ATM 2011), Berlin, Germany, June 2011.
13 NASA, Air Traffic Management Technology Demonstration-1 Concept of Operations Version 2.0, NASA/TM-2013-218040, 2013.
14 NASA, Air Traffic Management Technology Demonstration-1 Tech Transfer Document Summary Version 2.0, NASA/TM-2014- 216658, 2014.
15 Wynnyk, C., Balakrichna, M., MacWilliams, P., Becher, T., 2011 Trajectory Based Operations Flight Trials, 10th USA/Europe Air Traffic Management Research and Development Seminar (ATM 2013), Chicago IL, June 2013.
16 Mutuel, L.H., Paricaud, E., Neri, P., Initial 4D Trajectory Management Concept Evaluation, 10th USA/Europe Air Traffic Management Research and Development Seminar (ATM 2013), Chicago, IL, June 2013.
17 Eurocontrol, Initial 4D - 4D Trajectory Data Link (4DTRAD) Concept of Operations, December 2008.
18 Bowen, D., The SESAR Concept and i4D, Educational Workshop in ATM global 2014, September 2014.
19 Diaz-Mercado, Y., Lee, S.G., Egerstedt, M., Young, S.Y., Optimal Trajectory Generation for Next Generation flight Management Systems, Digital Avionics Systems Conference (DASC), 2013 IEEE/AIAA 32nd, East Syracuse, NY, October 2013.
20 Torres, S., Klooster, J.K., Ren, L., Castillo-Effen, M., Trajectory Synchronization Between Air and Ground Trajectory Predictors, Digital Avionics Systems Conference (DASC), 2011 IEEE/AIAA 30th, Seattle, WA, October 2011.
21 Cate, K.T., Challenges in Achieving Trajectory-based Operations, 51st AIAA Aerospace Sciences Meeting including the New Horizons Forum and Aerospace Exposition, Grapevine, TX, January 2013.
22 Enea, G., Porretta, M., A Comparison of 4D-Trajectory Operations Envisioned for NextGen and SESAR, Some Preliminary Findings, 28th International congress of the Aeronautical Sciences, Brisbane, Australia, September 2012.
23 Lacher, J., Battise, V., Koteskey, R., ADao, A.Q.V., Brandt, S.L., Ligda, S.V., Wu, S.C., Issues for Near-Term Implementation of Trajectory Based Operations, 9th USA/Europe Air Traffic Management Research and Development Seminar (ATM 2011), Berlin, Germany, June 2011.
24 SESAR Joint Undertaking, Business Trajectory/'4D' Trajectory, SESAR Factsheet, February 2010.
25 SESAR Consortium, The ATM Target Concept D3, Sesar Definition Phase - Deliverable 3, September 2007.
26 Klooster, J.K., Del Amo, A., Manzi, P., A Controlled Time-of-Arrival Flight Trials, 8th USA/ Europe ATM R&D Seminar, Napa, CA, 2009.
27 Jackson, M.R.C., O'Laughlin, B.E., Airborne Required Time of Arrival Control and Interaction with ATM, 7th AIAA Aviation technology, Integration and Operations Conference, Belfast, Northern Ireland, 2007.
28 Hughes, D., NextGen and SESAR Grapple With 4D Trajectories, Aviation Week & Space Technology online, August 2008.
29 FAA, Data Communication Overview, V. 11, February, 2010.
30 Jackson, M.R.C., Gonda, J., Mead, R., Gaccone, G., The 4D Trajectory Data Link (4DTRAD) Service - Closing the Loop for Air Traffic Control, IEEE Audio, Transactions of the IRE Professional Group on, 2009.
31 RTCA, DO-306 Change-1, Safety and Performance Standard for Air Traffic Data Link services in Oceanic and Remote Airspace (Oceanic SPR Standard), March 2011.
32 NextGen Institute, Joint FAA/SESAR Technical Interchanges Report, DTFAWA-05-A-00005-Task Order 0007, Element 2, FAA Chief Scientist for Architecture and Next Gen Development, November 2012.
33 FIXM website, http://www.fixm.aero
34 FAA, NextGen Implementation Plan, August 2014.
35 EUROCONTROL, AMAN Information Extension to En-Route Sectors-Concept of Operations, Ed. 1.0, June 2009.
36 EUROCONTROL, AMAN Status Review 2010, Ed. 0.1 December 2010.
37 European Airport CDM, Generic Operational Concept for Pre-departure Runway Sequence Planning and Accurate Take-Off Performance, Draft, February 2009.
38 EUROCONTROL, The EUROCONTROL DMAN Prototype - Description of DMAN in the A-CDM context, Ed.0.4, December 2010.
39 Teller, T. L., 4D FMS TBO Pilot-Controller Human-in-the-Loop simulation, Research Report of FAA - 4D FMS TBO Program, May 2011.
40 Lee, G., A Study on the Development and Implementation of International Standards on Trajectory Based Operations (TBO), Journal of the Korean Society for Aviation and Aeronautics, Vol. 22, No. 3, 2014.
41 Hof, H., Moore J., Harada, T., Trajectory Based Operations Concept Document(TBOCD), ICAO ATRMRPP-WG/28-WP/652, March 2015.
42 RTCA Special Committee (SC) 214, Terms of Reference - Standards for Air Traffic Data Comminucation Services, Revision 6, RTCA Paper No. 205-14/PMC-1254, September 2014.