Browse > Article
http://dx.doi.org/10.5139/JKSAS.2012.40.7.623

Design and Verification of Built In Test For KUH  

Kim, Sung-Woo (국방과학연구소)
Lee, Byoung-Hwa (국방과학연구소)
Chang, Won-Hong (국방과학연구소)
Oh, Woo-Seop (국방과학연구소)
Publication Information
Journal of the Korean Society for Aeronautical & Space Sciences / v.40, no.7, 2012 , pp. 623-628 More about this Journal
Abstract
Mission Equipment Package(MEP) system is a collection of avionic components that are integrated to perform the mission of the Korean Utility Helicopter(KUH). Built In Test(BIT) reduces the need for skilled personnel and special test equipment, and reduces maintenance down-time of system. The increasing complexity of avionics equipments has resulted in an increased need to provide BIT functions. This paper describe the development and verification for the KUH MEP system BIT.
Keywords
Interruptive Built In Test; Maintenance Fault List; Pilot Fault List; Continuous Built In Test; Power Built In Test;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 KUH 임무탑재장비 개발규격서(88PS7101), 2011
2 KUH 임무탑재장비 운용요구규격서 (88ZE7102), 2009
3 KUH 임무탑재장비 기능요구규격서 (88ZE7102), 2009
4 KUH 임무탑재장비 자체진단 시험 실기평가계획서(88PP0502), 2010
5 허완욱, 박은심, 윤정환 "무기체계 정비성 향상을 위한 BIT 설계 및 검증방안", 한국군사과학기술학회지, 제15권 제2호, pp.111-120, 2012