1 |
AASHTO (American Association of State highway and Transportation Officials) (2011), Asset Transportation Asset Management Guide; A Focus on Implementation, AASHTO, Washington,D.C.
|
2 |
ASCE (American Society of Civil Engineers) (2013), 2013 Report Card for America's Infrastructure, ASCE, Washington, D.C.(Available in :http://www.infrastructurereportcard.org/a/#p/home)
|
3 |
Austroads (2009), Guide to Asset Management Part1-7, Austroads Inc., Sydney.
|
4 |
Hyman, W.A. et al. (2009), NCHRP Report 389: Performance-based Contracting for Maintenance, TRB(Transportation Research Board),Washington, D .C.
|
5 |
BSI (2008), BSI PAS55; Publicly Available Specification for the Optimal Management of Physical Assets, British Standards Institution, Kingsclere, UK
|
6 |
Doran, G.T. (1981), There's a S.M.A.R.T. Way to Write Management's Goals and Objectives, Management Review, Vol.70, No.11, pp.35-36.
|
7 |
Han, D. (2011). Development of Open-source Hybrid Pavement Management System for an International Standard, A Doctoral Dissertation, Kyoto University, Japan.
|
8 |
Han, D., Do, M (2013). Development of Korean Life Cycle Cost Analysis Model for Road Pavement Asset Management, Journal of Korean Society of Civil Engineers, Vol.33, No.4, pp.1639-1650(in Korean)
DOI
|
9 |
Han, D., Yoo, I., and Lee, S. (2014), Development of Level of System for Road Infrastructure Asset Management, International Journal of Highway Engineering, Vol.16, No.4, pp.76-86(in Korean)
|
10 |
ISO 9001 (2008), ISO9001: Quality Management Systems-Requirement, ISO(International Standard Organization),Geneva
|
11 |
ISO 55000 (2014), ISO55000; Asset Management, ISO(International Standard Organization), Geneva
|
12 |
Jenks, C.W. et al. (2010), NCHRP Report 677:Development of Level of Service for the Interstate Highway System, TRB(Transportation Research Board), Washington,D.C.
|
13 |
JSCE (Japan Society of Civil Engineers) (2009), Challenge for Implementation of Asset Management(original title:アセトマネジメント導入への挑戰), Japan Society of Civil Engineers, Tokyo (in Japanese)
|
14 |
Kaplan, R.S. and Norton, D. P. (1992), The Balanced Scorecard - Measures That Drive Performance, Harvard Business Review(Jan.-Feb.). pp.71-79
|
15 |
Kaplan, R.S. and Norton, D. P. (2000), Strategy-Focused Organization; How Balanced Score card Companies Thrive in the New Business Environment(1steds.), Harvard Business School Press, Boston
|
16 |
Khan, Z., Moselhi, O., and Zayed, T. (2010), "Level of Service Based Methodology for Municipal Infrastructure Management", World Academy of Science, Engineering and Technology, Vol.3, No.4, pp.73-82
|
17 |
Lee, J. (2009), Administration Dictionary, Daeyoung Co.
|
18 |
Moen, R. and Norman, C. "Evolution of the PDCA Cycle", (Available in : http://pkpinc.com/files/NA01MoenNormanFullpaper.pdf)
|
19 |
PIARC (Permanent International Association of Road Congresses) (2000), Highway Development and Management Series: Vol.1-7, PIARC, La Defense Cedex.
|
20 |
TRB (Transportation Research Board) (2010), Highway Capacity Manual, TRB, Washington,D.C.
|
21 |
VBA(Veterans Benefits Administration) (2000), The Balanced Scorecard Handbook, Veterans Benefits Administration, (Availablein: http://www/clintonlibrary.gov/assets/storage/Research%20-%20Digital%20Library/ClintonAdminHistoryProject/101-111/Box%20110/1756368-vbahistory-project-field-operations-balanced-scorecardhandbook.pdf)
|
22 |
Walls III, J. and Smith, M. R. (1998). Life-cycle Cost Analysis in Pavement Design: In Search of Better Investment Decisions, FHWA-SA-98-079, FHWA(Federal Highway Administration), Washington, D.C.
|
23 |
WSHDOT (Washington State Department of Transportation) (2012), Maintenance Accountability Process: Manual, and Field Data Collection Manual, WSHDOT, Washington, D.C.
|
24 |
Yoo, I. et al., (2014), Development of Level of Service for Express Highway, Korea Expressway Company, Seongnam-Si, Korea.
|