1 |
AASHTO(2006), Mixture Conditioning of Hot-Mix Asphalt(HMA), AASHTO Washington, D.C..
|
2 |
David W. Janisch and Ourtis M. Turgeon (1996), "Sawing and Sealing Joints in Bituminous Pavements to control Cracking," Final Report, TPR1004, Minnesota Department of Transportation Office of Minnesota Road Research.
|
3 |
Fedral Highway Administration (1990), "Structural Overlay Strategies For Jointed Concrete Pavements," Final Report, FHWA-RD-89-146.
|
4 |
J. E. Noonan and F. R. McCullagh (1980), "Reduction of Reflection Cracking in Bituminous Overlays on Rigid Pavements," Research Report 80, Engineering Research and Development Bureau, New York State Department of Transportation.
|
5 |
M. Marquart (2001), "Evaluation of Saw and Seal over the Overlaid Existing Concrete Joints. Final Report," Project NH-3-002(040)212, North Dakota Department of Transportation.
|
6 |
Mostafa E. Elseifi, Rakesh Bandaru, Zhongjie "DOC"Zhang and Said Ismail (2011), "Field Evaluation and Cost Effectiveness of the Saw and Seal Method to control Reflection Cracking in Composite Pavements," Paper No. 11-1805, Transportation Research Board.
|
7 |
Walter, P. K and R. A. Bionda(1990), "Sawing and Sealing of Joints in Asphaltic Concrete Overlays," Transportation Research Record 1268, Transportation Research Board, Washington, D.C..
|