1 |
Yoshio Kawauchi, Marvin Rausand(1999), “Life Cycle Cost analysis in oil and chemecal process industries.”
|
2 |
Federal Transit Administration(2003), “The M3 urban transportation system,” MagneMotion Document UM-1, Version 1
|
3 |
B. S. Blanchard and W. J. Fabrycky(1998), “Systems engineering and analysis 3rd edition,” Prentice Hall International Series in Industrial and Systems Engineering
|
4 |
H. K. Jun and J. H. Kim(2007), “Life cycle cost modeling for railway vehicle,” Proceeding of International Conference on Electrical Machines and System
|
5 |
황용호, 김종태(1995), “수명주기비용 산정모델에 관한 연구”, 회계학논총, 제 4호, pp.23-24
|
6 |
전현규, 김재훈, 김종운, 박준서(2007), “자기부상열차 수명주기 비용모델 개발을 위한 기초연구”, 한국철도학회 논문집, pp.76-83
|
7 |
IEC 60300-3-3(2004), “Application guide - Life Cycle Costing,” IEC International Standards
|