Browse > Article

Extended Generic BOM for Urban Transit  

Park Kee-Jun (한국철도기술연구원, 도시철도기술개발사업단)
Chung Jong-Duk (한국철도기술연구원, 도시철도기술개발사업단)
Ahn Tae-Ki (한국철도기술연구원, 도시철도기술개발사업단)
Publication Information
Journal of the Korean Society for Railway / v.8, no.6, 2005 , pp. 539-543 More about this Journal
Abstract
This paper proposed the EGBOM, Extended Generic BOM, which is more flexible BOM system than GBOM. The GBOM system has the limitation to construct Result BOM and to select options by choosing only one Variant under given Cluster. In order to overcome this limitation, we propose the EGBOM which can make more various Result EGBOM, which can use to rolling stock through constructing urban transit BOM using the proposed EGBOM. The last, this paper describes the various Result BOM examples constructed from Source BOM of UT_EGBOM, such as rolling-stock maintenance BOM, individual car BOM, etc.
Keywords
Bill of Material(BOM); Generic BOM; Maintenance;
Citations & Related Records
연도 인용수 순위
  • Reference
1 S.Hsieh and K.-C. Tsai (2001). 'A BOM Oriented Class-Based Storage Assignment in an Automated Storage/Retrieval System', International Journal of Adv Manufacturing, 17, pp.683-691   DOI   ScienceOn
2 Hegge, H.M.H.; Wortmann, J.C. (1991). 'Generic bill-ofmaterial: a new product model', International Journal of Production Economics, 23(1-3), pp.117-28   DOI   ScienceOn
3 이한표, 이춘영, 이국철 (1999). 'Family BOM 데이타베이스 구조에 대한 대안 : 목적별 BOM 연결구조의 간접 표현 방법', 1995 추계 IE 학술대회 발표 논문집, 대한산업공학회, pp.195-202
4 이동국, 김재균, 장길상 (1999). '객체지향기법을 이용한 Gene-ric BOM 관리시스템(GBMS)의 설계 및 구현', 산업공학, 12(1), p.102-113
5 P. S. Rusk (1990). 'Role of bill of material in manufactureing systems', Engineering Costs and Production Economic, 19(13), pp.205-211   DOI   ScienceOn
6 H. Mather (1986). 'Design, bills of material, and forecasting the inseparable threesome', Management Science, 44(1), pp.90-106
7 Ji Guoli, Gong Daxin and Freddie Tsui (2003). 'Analysis and Implementation of the BOM of a tree-type structure in MRP II', Journal of Materials Processing Technology, 139, pp.535-538   DOI   ScienceOn
8 A. J. C. Trappey, T. K. Peng and H. D. Lin (1996). 'An objectoriented bill of materials system for dynamic product management', Journal of Intelligent Manufacturing, 7, pp.365-371   DOI   ScienceOn
9 Jun Du; Yuan-Yuan Jiao; Jianxin Jiao (2005). 'Integrated BOM and routing generator for variety synchronization in assemblyto-order production', Journal of Manufacturing Technology Management,16(2), pp.233-43   DOI   ScienceOn
10 N. A. J. Hastings and C. H. Yeh (1992). 'Bill of manufacture', Production and Inventory Management Journal, 33(4), pp.417-437
11 이호용, 한석윤, 박기준, 서명원 (2004). '도시철도 CBD 기반의 유지보수 BOM 시스템 개발', 한국철도학회, 7(4), pp.406-411
12 장길상, 김재균, 이종훈 (2000). '웹기반 Generic BOM 관리 시스템의 설계 및 구현', 산업경영시스템학회지, 23(57), pp.21-39
13 김정기, 김영호, 강석호 (1997). 'Web-based BOM', 1997 춘계 IE/MS 공동학술대회 논문집, 대한산업공학회, pp.401-404