1 |
S.Hsieh and K.-C. Tsai (2001). 'A BOM Oriented Class-Based Storage Assignment in an Automated Storage/Retrieval System', International Journal of Adv Manufacturing, 17, pp.683-691
DOI
ScienceOn
|
2 |
Hegge, H.M.H.; Wortmann, J.C. (1991). 'Generic bill-ofmaterial: a new product model', International Journal of Production Economics, 23(1-3), pp.117-28
DOI
ScienceOn
|
3 |
이한표, 이춘영, 이국철 (1999). 'Family BOM 데이타베이스 구조에 대한 대안 : 목적별 BOM 연결구조의 간접 표현 방법', 1995 추계 IE 학술대회 발표 논문집, 대한산업공학회, pp.195-202
|
4 |
이동국, 김재균, 장길상 (1999). '객체지향기법을 이용한 Gene-ric BOM 관리시스템(GBMS)의 설계 및 구현', 산업공학, 12(1), p.102-113
|
5 |
P. S. Rusk (1990). 'Role of bill of material in manufactureing systems', Engineering Costs and Production Economic, 19(13), pp.205-211
DOI
ScienceOn
|
6 |
H. Mather (1986). 'Design, bills of material, and forecasting the inseparable threesome', Management Science, 44(1), pp.90-106
|
7 |
Ji Guoli, Gong Daxin and Freddie Tsui (2003). 'Analysis and Implementation of the BOM of a tree-type structure in MRP II', Journal of Materials Processing Technology, 139, pp.535-538
DOI
ScienceOn
|
8 |
A. J. C. Trappey, T. K. Peng and H. D. Lin (1996). 'An objectoriented bill of materials system for dynamic product management', Journal of Intelligent Manufacturing, 7, pp.365-371
DOI
ScienceOn
|
9 |
Jun Du; Yuan-Yuan Jiao; Jianxin Jiao (2005). 'Integrated BOM and routing generator for variety synchronization in assemblyto-order production', Journal of Manufacturing Technology Management,16(2), pp.233-43
DOI
ScienceOn
|
10 |
N. A. J. Hastings and C. H. Yeh (1992). 'Bill of manufacture', Production and Inventory Management Journal, 33(4), pp.417-437
|
11 |
이호용, 한석윤, 박기준, 서명원 (2004). '도시철도 CBD 기반의 유지보수 BOM 시스템 개발', 한국철도학회, 7(4), pp.406-411
|
12 |
장길상, 김재균, 이종훈 (2000). '웹기반 Generic BOM 관리 시스템의 설계 및 구현', 산업경영시스템학회지, 23(57), pp.21-39
|
13 |
김정기, 김영호, 강석호 (1997). 'Web-based BOM', 1997 춘계 IE/MS 공동학술대회 논문집, 대한산업공학회, pp.401-404
|