Browse > Article
http://dx.doi.org/10.7842/kigas.2013.17.6.1

Internal Pressure Variation Analysis and Actual Holding Time Test on ISO LNG Tank Container  

Ryou, Young-Don (Korea Gas Safety Corporation)
Lee, Jin-Han (Korea Gas Safety Corporation)
Jo, Young-Do (Korea Gas Safety Corporation)
Oh, Young-Sam (Korea Gas Corporation)
Cha, Kyong-Ho (Yonsei University)
Publication Information
Journal of the Korean Institute of Gas / v.17, no.6, 2013 , pp. 1-7 More about this Journal
Abstract
Internal pressure variation analysis and actual holding time test on ISO LNG tank containers which were made in Korea for the first time according to the special notification of ISO tank container manufacture have been conducted during the transport demonstration projects of the tank containers by tractor, train and ship. The internal pressure of the LNG tank container increased rapidly after LNG filling and dropped during moving the container. However, it was stabilized as time passed and followed the liquid-vapor equilibrium graph. In addition, actual holding time of the tank container was more than 20 days which was satisfied with the special notification of LNG tank container manufacture.
Keywords
LNG Tank Container; Holding time; Pressure Variation; LNG Transport;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Korea Gas Safety Corporation, "A study on the improvement of law and regulation for using multipurpose complex transport LNG tank container", (2013)
2 MOTIE, "Special notification regarding manufacturing, filling, transporting and using LNG ISO tank container", (2013)
3 Chrat Ferox home page, http://www.chart-ferox.com/getattachment/51f3c55a-d190-4437-9e33-c9fb7c3a2e48/inter_containers_300001.aspx
4 Korea Gas Safety Corporation, Foreign trip report(U.S.), (2012)
5 49 CFR $\S$178.338-9
6 Korea Gas Safety Corporation, "7th tank container technical committee", (2012)
7 http://www.google.co.kr/imgres
8 Kiho Moon, etc, "Analysis of LNG Tank Cooldown system", Theories and Application of Chem. Eng., Vol. 8, No. 2, (2002)