1 |
Duverlie, P., Castelain, J. M., 'Cost Estimation During Design Step : Parametric Method versus Case Based Reasoning Method', The International Journal of Advanced Manufacturing Technology, 1999
DOI
|
2 |
유일상, '개발 프로젝트 시스템의 기술관리 설계모델', 박사학위논문, 아주대학교, 2003
|
3 |
Afitep(commission d'estimation), Estimation des cuts d'un Projet Industriel, ed. AFNOR, 1995
|
4 |
Garvey, P. R., Cho, C. C., 'An Index to Measure a System's Performance Risk', The Acquisition Review Quaterly, 2003
|
5 |
Farineau, T., Rabenasolo, B., Castelain, M., Meyer, Y., Duverlie, P., 'Use of Parametric Models in an Economic Evaluation Step During the Design Phase', The International Journal of Advanced Manufacturing Technology, 2001
DOI
|
6 |
Department of Defense, Risk Management Guide for DoD Acquisition(6th ed.), DAU Press, Fort Belvoir, 2006
|
7 |
Blanchard, B. S., Fabrycky, W. J., Systems Engineering and Analysis(4th ed.), Prentice Hall, New Jersey, 2006
|
8 |
Blanchard, B. S., Logistics Engineering and Management(6th ed.), Prentice Hall, New Jersey, 2008
|
9 |
Blanchard, B. S., 'The System Engineering Process : An Application for the Identification of Resource Requirements', Journal of the International Council on Systems Engineering, Vol. 1, No. 1, 1994
|