1 |
Caserta, M., S. Voss, and M. Sniedovich, "Applying the corridor method to a blocks relocation problem," OR Spectrum, Vol.33, No.4 (2011), pp.915-929.
DOI
ScienceOn
|
2 |
Cho, K.K., K.H. Chung, C. Park, J.C. Park, and H.S. Kim, "A spatial scheduling system for block painting process in shipbuilding," CIRP Annals, Vol.50, No.1(2001), pp.339-342.
DOI
ScienceOn
|
3 |
Ha, B.-H. and S. Kim, "A* algorithm for optimal intra-bay container premarshalling plan," Journal of the Korean Institute of Industrial Engineers, Vol.38, No.2(2012), pp. 157-172.
DOI
ScienceOn
|
4 |
Kim, K.H. and G.-P. Hong, "A heuristic rule for relocating blocks," Computers and Operations Research, Vol.33, No.4(2006), pp.940-954.
DOI
ScienceOn
|
5 |
Koh, S.G., "A production schedule with genetic algorithm in block assembly shop," Korean Management Science Review, Vol. 13, No.1(1996), pp.1-12.
과학기술학회마을
|
6 |
Koh, S.-G., J.-C. Park, Y.-S. Chon, and C.- M. Joo, "Development of a block assembly scheduling system for shipbuilding company," IE Interfaces, Vol.12, No.4(1999), pp.586-594.
|
7 |
Lee, J.K., K.J. Lee, H.K. Park, J.S. Hong, and J.S. Lee, "Developing scheduling systems for Daewoo Shipbuilding DAS project," European Journal of Operational Research, Vol.97, No.2(1997), pp.380-395.
DOI
ScienceOn
|
8 |
Lee, K.J., J.K. Lee, and S.Y. Choi, "A spatial scheduling system and its application to shipbuilding DAS-CURVE," Expert Systems With Applications, Vol.10, No.3/4(1996), pp. 311-324.
DOI
ScienceOn
|
9 |
Lee, S., J. Kim, and I. Moon, "Deployment planning of blocks from storage yards using a tabu search algorithm," Journal of the Korean Institute of Industrial Engineers, Vol.37, No.3(2011), pp.198-208.
과학기술학회마을
DOI
ScienceOn
|
10 |
Lee, Y. and Y.-J. Lee, "A heuristic for retrieving containers from a yard," Computers and Operations Research, Vol.37(2010), pp. 1139-1147.
DOI
ScienceOn
|
11 |
Park, C. and J. Seo, "A case study on assembly block operations management at shipyard," Korean Management Science Review, Vol.23, No.2(2006), pp.175-185.
과학기술학회마을
|
12 |
Park, C. and J. Seo, "Genetic algorithm of the planar storage location assignment problem," Journal of the Korean Institute of Industrial Engineers, Vol.35, No.2(2009), pp. 129-140.
과학기술학회마을
|
13 |
Park, C. and J. Seo, "Mathematical modeling and solving procedure of the planar storage location assignment problem," Computers and Industrial Engineering, Vol.57, No.3 (2009), pp.1062-1071.
DOI
ScienceOn
|
14 |
Park, C. and 1J. Seo, "Comparing heuristic algorithms of the planar storage location assignment problem," Transportation Research Part E, Vol.46, No.1(2010), pp.171-185.
DOI
ScienceOn
|
15 |
Park, K., K. Lee, S. Park, and S. Kim, "Modeling and solving the spatial block scheduling problem in a shipbuilding company," Computers and Industrial Engineering, Vol. 30, No.3(1996), pp.357-364.
DOI
ScienceOn
|
16 |
Park, M.-H., W.-S. Lee, Y.-S. Ock, and T.- E. Lee, "A review of Korean shipbuilding industry and engineering research," IE Interfaces, Vol.8, No.2(1995), pp.5-20.
|
17 |
Pochet, Y. and L.A. Wolsey, Production Planning by Mixed Integer Programming. Springer, New York, 2006.
|
18 |
Won, S.H. and K.H. Kim, "Allocating storage spaces for temporary inventories considering handling, transportation, and storage capacities," Journal of the Korean Operations Research and Management Science Society, Vol.31, No.3(2006), pp.11-25.
과학기술학회마을
|
19 |
Son, J.-R. and K.-K. Cho, "Design for block logistics system of storage location assignment in shipbuilding," In Proceedings of the 12th Annual International Conference on Industrial Engineering : Theory, Applications and Practice, Cancun, Mexico, 2007.
|
20 |
Wan, Y., J. Liu, and P.-C. Tsai, "The assignment of storage locations to containers for a container stack," Naval Research Logistics, Vol.56(2009), pp.699-713.
DOI
ScienceOn
|