1 |
Martello, S., F. Soumis, and P. Toth, "Exact and approximation algorithms for makespan minimization on unrelated parallel machines," Discrete Applied Mathematics, Vol.75(1977), pp.169-188.
|
2 |
Kwon, O.J., D.H. Kang, K.S. Lee, and S.S. Park, "Targeting and Scheduling Problem for Field Artillery," Computers and Industrial Engineering, Vol.33(1997), pp.693-696.
DOI
ScienceOn
|
3 |
Plekar, U.S., N. Rama, and K. Toaffe, "Duality based relaxations for makespan minimization for unrelated parallel machines," TIME/ORSA Bullutin, Vol.31, No.21(1991).
|
4 |
김태헌, 이영훈, "공유표적을 포함한 사격 순서 결정에 관한 연구", 한국경영과학회지, 제28호, 제3호(2003), pp.123-134.
과학기술학회마을
|
5 |
황원식, 이재영, "스케줄링을 이용한 계획표적 사격 순서의 최적화에 관한 연구", 한국국방경영분석학회지, 제33권, 제1호(2007), pp.105-115.
과학기술학회마을
|
6 |
Fowler, J.W., "Scheduling of unrelated parallel machines an application to PWB manufacturing," IIE Transactions, Vol.34(2002), pp. 921-931.
|
7 |
Hariri, A.M.A. and C.N. Potts, "Heuristic for scheduling unrelated parallel machines," Computers and Operations Research, Vol.18, No.3 (1991), pp.323-331.
DOI
ScienceOn
|
8 |
육군본부, 화력실무운용, RM 32-0-47, 2004.
|
9 |
Sundararaghavan, P. and M. Ahmed, "Single machine scheduling with start time dependent processing times," European Journal of Operational Research, Vol.78, No.3(1994), pp. 394-403.
DOI
ScienceOn
|
10 |
육군본부, 화력운용, FM 3-10, 2008.
|
11 |
김기호, "포병부대 계획표적 사격 순서 결정에 관한 연구", 고려대학교 논문, 2002.
|
12 |
육군본부, 포병운용, FM 2-2, 2002.
|