1 |
Sobel, M.J., 'Smoothing start-up and shutdown costs: concave case,' Management Science, Vol.17, No.1(1970), pp.78-91
DOI
ScienceOn
|
2 |
Sung, C.S. and W.S. Lee, 'Setup cost reduction in a dynamic lot size model with multipIe finite production rates,' Engineering Optimization, Vol.24(1995), pp.19-37
DOI
ScienceOn
|
3 |
Yang, J., B. Goany, and G. Yu, 'A concave- Cost Production Planning Problem with Remanufacturing Options,' Naval Research Logistics, Vol.52(2005), pp.443-458
DOI
ScienceOn
|
4 |
Richter, K. and J. Weber, 'The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost,' Int. J. of Production Economics, Vol.71 (2001), pp. 447-456
DOI
ScienceOn
|
5 |
Zangwill, W.I., 'A deterministic multi-period production scheduling model with backlogging,' Management Science, Vol.13, No.1 (1966), pp.105-119
DOI
ScienceOn
|
6 |
Wagner, H.M. and T.M. Whitin, 'Dynamic version of the economic lot size model,' Management Science, Vol.5, No.1(1958), pp. 89-96
DOI
ScienceOn
|
7 |
Sung, C.S. and W.S. Lee, 'Rolling schedules for a dynamic lot-sizing problem with startup costs,' Engineering Optimization, Vol.22, No.2(1994), pp.137-152
DOI
ScienceOn
|
8 |
Lee, C.Y. and E.V., 'Denardo, Rolling planning horizon : error bounds for the dynamic lot size model,' Mathematics of Operations Research, Vol.11, No.3(1986), pp.423-432
DOI
|
9 |
주운기, '단일 재생 처리 설비를 이용한 재생계획', '한국경영과학회지', 제25권, pp.111-122
|
10 |
Inderfurth, K., 'Optimal policies in hybrid manufacturing/remanufacturing systems with product substitution," Int. J. of Production Economics, Vol.90(2004), pp.325-343
DOI
ScienceOn
|
11 |
Love, S.F., 'Bounded production and inventory models with piecewise concave costs,' Management Science, Vol.20, No.3 (1973), pp.313-318
DOI
ScienceOn
|
12 |
Florian, M., Lensta, J,K., and A. RinnooyKan, 'Deterministic production planning : algorithms and complexity,' Management Science, Vol.26, No.7(1980), pp.374-384
|
13 |
Guide, Jr. V.D., 'Scheduling using drumbuffer- rope in a remanufacturing environment,' International Journal of Production Research, Vol.34(1996), pp.1081-1091
DOI
|
14 |
Richter, K. and M., Sombrutzki, 'Remanufacturing planning for the reverse Wagner/ Whitin models,' European Journal of Operational Research, Vol.121(2000), pp.304-315
DOI
ScienceOn
|
15 |
Swoveland, C., 'A deterministic multi-period production planning model with piecewise concave production and holding-backorder costs,' Management Science, Vol.21, No.9(1975), pp.1007-1013
DOI
ScienceOn
|
16 |
Zangwill, W.I., 'A backlogging model and a multi -echelon model of a dynamic lot size production system-a network approach,' Management Science, Vol.15, No.9(1969), pp.506-527
DOI
ScienceOn
|
17 |
Guide, Jr. V.D. and Spencer, M.S., Roughcut capacity planning for remanufacturing firms, Production Planning and Control, 1995
|
18 |
Lambert, A.M. and H. Luss, 'Production planning with time-dependent capacity bounds,' European Journal of Operations Research, Vol.9, No.4(1982), pp.275-280
DOI
|
19 |
Boaz Golany, Jian Yag, and Gang Yu, 'Economic lot-sizing with remanufacturing options,' IIE Transactions, Vol.33(2001), pp. 995-1003
DOI
ScienceOn
|
20 |
이동은, 이운식, 구평회, 이강배, '용량제약을 갖는 단일설비에서의 동적 재생산계획문제', '한국경영공학회지', 제12권, 제1호(2007), pp.11-24
|
21 |
Florian, M. and M. Klein, 'Deterministic production planning with concave cost and capacity constraints,' Management Science, Vol.18(1971), pp.12-20
DOI
ScienceOn
|
22 |
김현수, 한대의, '국내 리메뉴팩처링 시스템 산업의 문제점과 개선방안에 관한 연구', 산업기술종합연구소, 제17권(1999), pp.263-277
|