1 |
박찬우, 이효성, '복합포아송 수요와 Coxian 가공시간을 갖는 CONWIP 시스템의 성능평가', 한국경영과학회지, 제31권, 제3호(2006), pp.63-79
과학기술학회마을
|
2 |
Duenyas, I. and W.J. Hopp, 'Estimating the Throughput of an Exponential CONWIP Assembly System,' Queueing systems, Vol. 14(1993), pp.135-157
DOI
|
3 |
Duenyas, I., W.J. Hopp and M.L. Spearman, 'Characterizing the Output Process of a CONWIP Line with Deterministic Processing and Random Outages,' Mgmt. Sci., Vol.39(1993), pp.975-988
DOI
ScienceOn
|
4 |
Karmarkar, U.S., 'Push, Pull and Hybrid Control Schemes,' Working Paper QM8614, (1986) Graduate school of Management, Univ. of Rochester
|
5 |
Spearman, M.L., 'Customer Service in Pull Production System,' Operations Research, Vol.40(1992), pp.948-958
DOI
ScienceOn
|
6 |
Harrison, P.G. and N.M. Patel, Performance Modelling of Communication Networks and Computer Architectures, Addison - Wesley, (1993), pp.258-297
|
7 |
이정은, 이효성, 'Compound Poisson 수요를 갖는 CONWIP 시스템의 근사적 분석', 한국경영과학회지, 제23권, 제3호(1998), pp.153-168
|
8 |
Baynat, B. and Y. Dallery, 'A Unified View of Product-form Approximation Techniques for General Closed Queueing Networks,' Performance Evaluation, Vol.18(1993), pp.205-224
DOI
ScienceOn
|
9 |
Song, J.S., S.H. Xu, and B. Lin, 'OrderFulfillment Performance Measures in an Assemble-to-Order System with Stochastic Leadtimes,' Operations Research, Vol.47, No.1(1999), pp.131-149
DOI
ScienceOn
|
10 |
Hall, K. W., 'Synchro MRP : Combined Kanban with an MRP, the Yamaha PTMAC system-production Planning and Control in Japan,' American Production and Inventory Control Society, (1986), pp.43-56
|
11 |
Duenyas, I. and W.J .Hopp, 'CONWIP Assembly System with Deterministic Processing and Random Outages,' IIE Transactions, Vol.24, No.4(1992), pp.97-111
DOI
ScienceOn
|
12 |
Spearman, M.L., D.L. Woodruff, and W.J. Hopp, 'CONWIP: A Pull Alternative to Kanhan,' Int. J. Prod Res. Vol.28(1990), pp.878-894
|
13 |
Law, A.M. and W.D. Kelton, Simulation Modeling and Analysis, 2nd ed., McGraw-Hill, New-York, 1991
|