Browse > Article

Comparison of Production and Distribution Policy in the Supply Chain Model Considering Characteristics of the Semiconductor Industry  

Chung Sung Uk (연세대학교 컴퓨터과학ㆍ산업시스템공학과)
Lee Byung Jin (연세대학교 컴퓨터과학ㆍ산업시스템공학과)
Lee Young Hoon (연세대학교 컴퓨터과학ㆍ산업시스템공학과)
Publication Information
Abstract
Semiconductor industry is the one whose supply chain network is distributed all over the world. And it has different characteristics with other manufacturing industries as reentrancy, binning, substitution. In this paper, we suggest supply chain models for the semiconductor industry, consisting of production and distribution chains, where manufacturing characteristics are considered. Three policies for the production chain and two policies for the distribution chain are suggested and formulated mathematically. Six combination policies are tested for the evaluation of performances with example. It is shown that the supply chain is operated, if production and distribution are coordinated and managed based on the demand information, without inventory, as efficiently as the chain with inventory.
Keywords
Supply Chain Management; Semiconductor Industry; Push; Balance; Pull Model;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Glassey, C.R and M.G.C. Resende, 'A scheduling rule for job release in semiconductor fabrication,' Operations Research Letters, 7(1988b), pp.213-217
2 Jain, s., B. Gan, C. Lim and Y Low, 'Bottleneck based modeling of semiconductor supply chains,' Proceedings of the MASM Conference(2000), pp.340-345
3 Lee, Y.H., J.K. Park and S.Y. Kim, 'Experimental study on input and bottleneck scheduling for a semiconductor fabrication line,' IIE Transactions, 34(2002), pp.179-190
4 Spearman, M.L., D.L. Woodruff and W.J. Hopp, 'CONWIP: a pull alternative to kanban,' International Journal of Production Research, Vol.28, NO.5(1990), pp.879-894
5 Lee, Y.H. and T.H. kim, 'Manufacturing cycle time reduction using balance control in the semiconductor fabrication line,' Production Planning and Control, Vol.13, No.6(2002), pp.529-540   DOI   ScienceOn
6 Ahmadi, J., R, Benson and D. Supernaw-Issen, 'Supply chain production planning,' Operational Research in Industry, Edited by T.A. Ciriani, S. Gliozzi, E.L. Johnson, and R Tadei, Macmillan Press(1999), pp.199-232
7 Glassey, C.R. and M.G.C. Resende, 'Closedloop job release control for VSLI circuit manufacturing,' IEEE Transactions on Semiconductor Manuacturing, Vol.1, No.1(1988a), pp.36-46   DOI   ScienceOn
8 Jain, S., B. Gan, C. Lim and Y Low, 'Criticality of detailed modeling in semiconductor supply chain simulation,' Proceedings of the 1999 Winter Simulation Conference(1999), pp.888-896
9 Pierce, N.G. and T. Yurtsever, 'Valuebased dispatching for semiconductor wafer fabrication,' The Proceedings of International Conference on modeling and Analysis of Semiconductor Manufacturing(2000), Arizona, pp.172-176
10 Christie, R.M. and D. WU, 'Semiconductor capacity planning : stochastic modeling and computational studies,' IIE Transactions, 34(2002), pp.131-143
11 Ovacik, I.M. and W. Weng, 'A framework for supply chain management in semiconductor manufacturing industry,' IEEE/CPMT International Electronics Manufacturing Technology Symposium, 1995
12 Liu, C., 'A modular production planning system for semiconductor manufacturing,' Ph.D. Dissertation, University of California, Berkeley, 1992
13 Bouff, J,L., 'Semiconductor manufacturing : A supply chain management perspective,' Conference on Global Supply Chain Management, Singapore, 1997
14 Kim, S., S. Yea and B. Kim, 'Stepper scheduling in semiconductor wafer fabrication process,' Proceedings of the International Conference on Modeling and Analysis of Semiconductor Manufacturing(2000), pp.157-162
15 Lee, Y.H., 'Supply chain model for the semiconductor industry of global market,' Journal of Systems Integration, 10(2001), pp, 189-206
16 Lee, Y.H. and B.J, Lee, 'Push pull production planning of the reentrant process,' International Journal of Advanced Manufacturing Technology, 22(2003), pp.922-931
17 Murty, S.V. and J,W. Bienvenu, 'Global planning at Harris Semiconductor,' IEEE International Symposium on Semiconductor Manufacturing, 1995
18 Lee, YR., S.U. Chung and B.J, Lee, 'Supply Chain Model for the Semiconductor Industry considering manufacturing characteristics,' Production Planning and Control, submitted, 2003
19 Lou, S.X.C and P.W. Kager, 'A robust production control policy for VLSI wafer fabrication,' IEEE Transactions on Semiconductor Manufacturing, Vol.2, No.4(1989), pp.159-164   DOI   ScienceOn
20 Wein, L.M., 'Scheduling semiconductor wafer fabrication,' IEEE Transactions on Semiconductor Manufacturing, Vol.1, No.3(1988), pp.115-129   DOI   ScienceOn
21 Morrison, J., M. Janakiram and P.R Kumar, 'A comparative study of scheduling policies at Motorola fabs,' The Proceedings of International Conference on Semiconductor Manufacturing Operational Modeling and Simulation, San Francisco(1999), pp.51-56