1 |
Civil Engineering Department Hong Kong (1997), "Model Specification for prestressed ground anchors", Geotechnical Control Office, GEOSPEC1.
|
2 |
Deutshe Industrie Normen (1990), "Ground Anchorages Design, construction and testing", DIN-4125.
|
3 |
Fujiwara, Y. and Sakai, T. (2016), "A Study of a Lift-off Test Method for Ground Anchors", Journal of JSCE, Vol.4, pp.106-117.
DOI
|
4 |
Ground Anchor Technology Association (1997), "Design.Construction Guideline for Ground Anchor".
|
5 |
Kim, N.K. (2001), "Pullout Capacity of Ground Anchors in Weathered Soil", Journal of The Korean Geotechnical Society, Vol.17, No.4, pp.231-239.
|
6 |
Korea Expressway Corporation (2016), "A Survey on the Application Actual Condition and Establishment of Performance Improvement countermeasure of Permanent Anchor for Ground Reinforcement", In Korean.
|
7 |
Ministry of Land, Transport and Maritime Affairs (2010), "Ground Anchor Design.Construction and Maintenance Manual", In Korean.
|
8 |
Post Tensioning Institute (1996), "Recommendations for Prestressed Rock and Soil Anchors, 3rd ed", Post Tensioning Institute.
|
9 |
Sabatini, P.J., Pass, D.G., and Bachus, R.C. (1999), "Geotechnical Engineering Circular NO. 4 Ground Anchors and Anchored systems", U.S Department of Transportation, FHWA-IF-99-015.
|
10 |
British Standards Institution (1989), "British Standard Code of Practice for Ground anchorages", BS 8081.
|