1 |
Chung, J.S., Oh, S.J., Boo, S.D., and Koo, H.S. (2000), "A Study on Prestressing Order of Tendons for Girder Bridges", Proc. of 2000 conf. on Korean Society of Civil Engineers., pp.51-54.
|
2 |
Chung, H.S., Kim, J.S., and Kim, D.Y. (2000), "Stability of the Connections of Trapezoidal Segments Lining in Shield Tunnelling", Journal of the Korea Society of Civil Engineers, Vol.20, No.1-C, pp.13-20.
|
3 |
Ha, S.S., Cho, K.R., Kim, S.H., Moon, J.H., and Lee, L.H. (2004), "An Experimental Study on the Structural Behavior of the PC Beam-Column Exterior Joint with Strand", Journal of Architectural Institute of Korea Structure & Construction, Vol.20, No.10, pp. 119-126.
|
4 |
Jeong, G.H., Yu, C.D., Cho, S.H., Hwang, B.S., Han, K.T., Kim, T.H., and Jung, D.W. (2004), "A Trend Study of Shield Tunnel on Japan & Korea", Proc. of KTA 2004 Symposium, Seoul, Korea, pp.175-196.
|
5 |
Ma, S.J., Gil, H.J., and Kim, D.M. (2012), "A Study on Prestressing Method for Shield tunnel Assembly Using Strands", Proc of 2012 Conf. on Korean Society of Civil Engineers, KSCE, pp.1338-1345.
|
6 |
Ma, S.J., Gil, H.J., and Kim, D.M. (2013), "A Study on the Improvement of Connection Method for Segment in Tunnel Lining System Using Prestressed Steel Cable by Real-scale Test", Journal of Korean Geotechnical Society, Vol.29, No.6, pp.33-51.
DOI
|