1 |
Kazuyoshi Nishikawa (2003), "Development of a prestressed and precast concrete segmental lining", Tunnelling and Underground Space Technology 18, pp. 243-251.
DOI
ScienceOn
|
2 |
Masanori, K., Ikuo, O.E., Noriyuki, A., and Masaaki, N. (2002), "Development of New Type Segment Joint", Proceedings of the Symposium on Underground Space Vol.7, JSCE.
|
3 |
Chung, J. S., Oh, S. J., Boo, S. D., and Koo, H. S. (2000), "A Study on Prestressing Order of Tendons for PSC Box Girder Bridges", Proceedings of Korea Society of Civil Engineers (KSCE) Conference 1993, KSCE, pp.51-54.
|
4 |
Ha, S. S., Cho, K. R., Kim, S. H., Moon, J. H., and Lee, L. H. (2004), "An Experimental Study on the Structural Behavior of the PC Beam-Column Exterior Joint wIih Strand", Journal of Architectural Institute of Korea Structure & Construction, Vol.20, No.10, pp. 119-126.
|
5 |
Jeong, G. H., Yu, C. D., Cho, S. H., Hwang, K. T., Kim, T. H., and Jung, D. (2004), "A Trend Study of Shield Segment in Japan & Korea", Proceedings of Korean Tunneling Association (KTA) 2004 Symposium, Seoul, Korea.
|
6 |
KICTTEP (Korea Institute of Construction & Transportation Technology Evaluation and Planning) (2010), "Planning Research of TBM Technical Development for Mechanization and Automation in Tunnelling", Planning Research Report of KICT.
|
7 |
KICT (Korea Institute of Construction Technology) (2012), "Development of Cable Assembling System of Segment Tunnel Lining for Economics Improvement Leakage Reduction".
|