1 |
日本建設省土木硏究所(1982), 橋台の側方移動に關する硏究, 土木硏究所資料第1804號
|
2 |
日本道路公團高速道路調査會(1981), 軟弱地盤上の橋台移動に關する調査硏究報告書
|
3 |
Azizi, F. (2000), Applied analyses in geotechnics. Taylor & Francis, New York
|
4 |
Bathe, K.-J. (1996), Finite element procedures. Prentice-Hall International, Inc., New Jersey
|
5 |
Begemann, H. K. S. and De Leeuw, E. H. (1972), "Horizontal earth pressures on foundation piles as a result of nearby soil fills", Proc. of the 5th Int. Conf. of Soil Mech. and Found. Engrg., Madrid, Spain, Vol.1, pp.3-9
|
6 |
Bransby, M. F. (1995), Piled foundations adjacent to surcharge loads, Ph.D. dissertation, University of Cambridge
|
7 |
Jeong, S., Seo, D., Lee, J., and Park, J. (2004), "Time-dependent behavior of pile groups by staged construction of an adjacent embankment on soft clay", Can. Geotech. J., Vol.41(4), pp.644-656
DOI
ScienceOn
|
8 |
Kim, S. K. and Im, J. C. (2003), "Failure of the west breakwater of the Busan new port: lessons to learn", Proc. of Korea-Japan Joint Workshop on Characterization of Thick Clay Deposits, Reclamation and Port Construction, pp.139-154
|
9 |
Randolph, M. F. (1981), "The response of flexible piles to lateral loading", Geotechnique, London, England, Vol.31(2), pp.247-259
DOI
ScienceOn
|
10 |
Tschebotarioff, G. P. (1973), Foundations, Retaining and Earth Structures. McGraw-Hill, New York, 2nd Ed., pp.365-414
|
11 |
한국지반공학회 (2004), 부산신항 호안 2공구 준설토 투기에 따른 호안 안정성 검토 연구보고서, (주)삼성물산 건설부문
|
12 |
Stewart, D. P., Jewell, R. J., and Randolph, M. F. (1994), "Design of piled bridge abutments on soft clay for loading from lateral soil movements", Geotechnique, Vol.44(2), pp.277-296
DOI
ScienceOn
|
13 |
Potts, D. M. and Zdravkovic, L. (2001), Finite element analysis in geotechnical engineering: Application. Thomas Telford, London
|
14 |
해양수산부 (1997), 부산 신항만 준설토 투기장 호안등 실시설계 보고서(지반조사편,웅천대교 건설공사 편)
|
15 |
De Beer, E. E. and Wallays, M. (1972), "Forces induced in piles by unsymmetrical surcharges on the soil around the piles", Proc. of the 5th Int. Conf. of Soil Mech. and Found. Engrg., Madrid, Spain, Vol.1, pp.325-332
|
16 |
Biot, M. A. (1956), "General solutions of the equations of elasticity and consolidation for porous material", Journal of Applied mechanics, Vol. 23(2)
|
17 |
Ellis, E. A. and Springman, S. M. (2001), "Full-height piled bridge abutments constructed on soft clay", Geotechnique, Vol.51(1), pp. 3-14
DOI
|
18 |
Springman, S. M. (1989), Lateral loading of piles due to simulated embankment construction. Ph.D. dissertation, University of Cambridge
|
19 |
Randolph, M. F. (1977), A theoretical study of the performance of piles. Ph.D. dissertation, University of Cambridge
|
20 |
Stewart, D. P. (1992), Lateral loading of piled bridge abutments due to embankment construction. Ph.D. dissertation, University of Western Australia
|
21 |
Seo, D. H. (2006), Time-dependent behavior of pile groups on soft clay underlying approach embankment, Ph.D. dissertation, Yonsei University
|
22 |
Brinkgreve, R. B. J., Broere, W., and Waterman, D. (2004), PLAXIS 2D - Version 8. Professional Version, PLAXIS B.V., Netherlands
|
23 |
Jaky, J. (1944), "The coefficient of earth pressure at rest", J. of the Union of Hungarian Engineers and Architects, pp.355-358
|