Browse > Article
http://dx.doi.org/10.5394/KINPR.2016.40.6.421

Simulation Model Development for Configuring a Optimal Port Gate System  

Park, Sang-Kook (Logistics System Institute)
Kim, Young-Du (Maritime Safety Research Center, Korea Ship Safety and Technology Authority)
Abstract
In this study, a gate simulation model was developed to reduce the truck waiting time for trucking companies servicing container terminals. To verify the developed model, 4 weeks of truck gate-in/gate-out data was collected in December 2014 at the Port of Busan New Port. Also, the existing gate system was compared to the proposed gate system using the developed simulation model. The result showed that based on East gate-in, a maximum number of 50 waiting trucks with a maximum waiting time of 120 minutes. With the proposed system the maximum number of waiting trucks was 10 with a maximum waiting time of 5.3 minutes. Based on West gate-in, the maximum number of waiting trucks was 17 and the maximum waiting time was 34 minutes in the existing gate system. With the proposed system the maximum number of waiting trucks was 10 with a maximum waiting time of 5.3 minutes. Based on West gate-out, the maximum number of waiting trucks was 11 with a maximum waiting time of 5.5 minutes. With the proposed system the maximum number of waiting trucks was 9 with a maximum waiting time of 4.4 minutes. This developed model shows how many waiting trucks there are, depending on the gate-in/gate-out time of each truck. This system can be used to find optimal gate system operating standards by assuming and adjusting the gate-in/gate-out time of each truck in different situations.
Keywords
Port Operation; Gate System; Container Terminal; Gate Simulation Model; Inter Terminal Transshipment(ITT);
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Bupan Port Authory(2016), Busan Port 20 million TEU Achieved Total War, Shipping Professional Press Conference, http://www.ksg.co.kr/.
2 Choi, H. R., Lee, C. S., Shon, J. R., Lee, H. J., Lee, H. I., Shin, J. J(2009), Selection of Optimum Alternative for Deploying Automated Gate System in Container Terminal, Entrue Journal of Information Technology, Vol. 8, No. 2, pp. 171-181.
3 Choi, Y. S., Ha, T. Y., Kim, W. S(2006), Analysis of Operational Impact for Separated Gate System in Port Container Terminal, Journal of navigation and port research, Vol. 30, No. 5, pp. 389-396.   DOI
4 Lee, H. I(2009), A Study on the Efficiency Evaluation of Container Truck Interface System in the Horizontal Layout Container Terminal, Doctoral Thesis of Dong-a University.
5 Dragovic, B., Park, N. K, Radmilovic, Z. R(2006a), Ship-berth link performance evaluation: Simulation and analytical approaches, Maritime Policy & Management, Vol. 33, No. 3, pp. 281-299.   DOI
6 Dragovic, B., Park, N. K, Radmilovic, Z. R(2006b), Modeling of ship-berth-yard link performance and throughput optimization, Proceeding of Annual Conference-The IAME, pp. 1-21.
7 Hong, D. H., Chung, T. C(2003), Optimized design for gate complex and operation method of automated port, The KIPS transactions : Part A, Vol. 10A, No. 5, pp. 513-518.   DOI
8 Ministry of Oceans and Fisheries(MOF)(2013), A Study on Estimation of the Proper Cargo Handling Capacity by Port Cargo Exclusive Pier.
9 Ministry of Oceans and Fisheries(MOF)(2014), A Study on Estimation of the Proper Cargo Handling Capacity by Container Terminals.
10 Wenkai Li, Yong Wu, Mark Goh(2015), Planning and Scheduling for Maritime Container Yards, Springer, ISBN: 978-3-319-17024-4, p. 8.