Browse > Article
http://dx.doi.org/10.5394/KINPR.2009.33.6.375

A Development of Floating Dock Controller for Skid Launching System  

Kim, Jee-Hun (Samsung Heavy Industry)
Lee, Jang-Yong (Naviscontrol)
Park, Sok-Chu (Korea Maritime university)
Abstract
The authors had consisted the construction of shipyard must be investigated under the consideration of long term ship's demand and so the Floating Dock might be an alternative to the dry dock. This paper shows a development of Floating Dock Controller for Skid Launching System(SLS). While loading out a block to the Floating Dock and launching ship from the Floating Dock, the balancing of the ship and the dock is very important and achieved by adjusting the Ballast tank of the Floating Dock In this paper a Floating Dock Controller for SLS was developed through the on-line interface of VRC(Valve Remote Control), Tank Level & Draft Measuring System and Valve Control algorithm on Tank Plan. The control system developed was applied to a shipbuilding and verified good and stable.
Keywords
Floating dock; Ship Yard; Loading out; Launching; Skid Launching System(SLS);
Citations & Related Records
Times Cited By KSCI : 5  (Citation Analysis)
연도 인용수 순위
1 Kim, J H, Lee, J Y, and Park, S. C.(2008), "a Development of Floating Dock Control Simulator for Skid Launching System," Journal of Korean Institute of Navigation and Port Research, VoL 32, No. 1, pp.1-7   DOI   ScienceOn
2 Roh, M. I. and Lee, K. Y.(2006), "Generation of the Production Material Information of a Building Block and the Simulation of the Block Erection Based on the Initial Hull Structural Model," Journal of the Society of Naval architecture, v.43, no.1, pp.103-118   DOI   ScienceOn
3 Song, Y. J, Lee, K. K., Lee, D. K., Hwang, I. H., Woo, J. H., and Shin, G. S.(2008), "Development of a Design Framework for Simulation Based Shipyard Layout," Journal of the Society of Naval architecture, v.45, no.2, pp.202-212   DOI   ScienceOn
4 Lee, J w. and Kim, H J(1995), "Erection Process Planning & Scheduling using Genetic algorithm," Journal of the Society of Naval architecture, VoL 32, No.1, pp. 9-16
5 Yun, H H, and Sheen, D. H(2008), "Development of Monitoring System for Hull Construction Processes Using TOC analysis," Journal of the Society of Naval architecture, v.45, no.3, pp.315-321   DOI   ScienceOn
6 Kim, Y. S. and Lee, D. H.(2007), "a Study on the Construction of Detail Integrated Scheduling System of Ship Building Process," Journal of the Society of Naval architecture, v.44, no.1, pp.48-54   DOI   ScienceOn