Browse > Article
http://dx.doi.org/10.5394/KINPR.2003.27.4.471

A Effect of Unreliable Default Parameter in Forecasting Delay and Level of Service of Signalized Intersection  

Kim, Sung-Deuk (Dept., of Civil & Environment eng, Ulsan University)
Park, Won-Kyu (Dept., of Civil & Environment eng, Ulsan University)
Kim, Kyung-Kyu (Dept., of Civil & Environment eng, Ulsan University)
Abstract
In the Signalized Intersection, the capacity analysis is conducted with a large amount of input data such as road way, traffic and signal condition. but the level of service(LOS) is determined by delay estimated as a measure of effectiveness (MOE) based on this procedure. However, It is under the circumstances which are not considered for the errors caused by the uncertainty of input data in the field(the turing volumes, lane geometry, signal timing, grade of approach lane, percentage heavy vehicles, peak hour factor and arrival type etc.) as become the bases in the determination of the capacity and LOS. It includes the problem of reliability which is not verified for the capacity and LOS estimated. So, this study is to suggest the minimization of their influences by examining whether the uncertainty of input data such as the traffic volume, percentage of heavy vehicles and roadway geometry on the approach lane in the intersection under the study affects the capacity analysis and LOS determination.
Keywords
Input Parameters; Sensitivity Analysis; Level of Service; Signalized Intersection;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Reilly J. R, Kell M. L., Gallagher R. P.(1982), Urban Signalized Intersection Capacity, NCHRP 3-28[2]Report, TRB, National Research Council
2 Skabardonis A., May A. D.(1985), Comparative Analysis of Computer Models for Arterial Signal Timing, Transportation Research Record
3 Teodorvic D., Kikuchi S., Chakraborty P.(1990), Analysis of Delay and Level of Service at Signalized Intersections in Delaware, Report 90-DTC-4, Delaware Transportation Center
4 건설교통부(1999), 도로용량편람 개선 연구, 교통 개발연구원
5 이승환(1989), 교차로 용량분석을 위한 교통류특성 기초조사, 대한교통학회지 제7권 제2호   과학기술학회마을
6 오영태, 심대영(1992), 도시부 신호교차로의 기본 용량 및 기하구조 보정계수, 대한 교통학회지 제10권 제2호   과학기술학회마을
7 하동익(1997), 신호교차로 지체체계 분석 방법론 연구, 대한교통학회지 제15권 제2호   과학기술학회마을
8 Agent K., Crabtree L.(1983), Analysis of Lost Times at Signalized Intersection, Transportation Research Record
9 Cathy A., Koga. (1996), Comparison of 1985 and 1994 HCM : Signalized Intersection Delay Estimates, ITE Journal
10 Carstens R. L.(1971), Some Traffic Parameters at Signalized Intersections, Traffic Engineering, Vol. 41 No. 11.
11 Cronje W. B.(1983), Derivation of Equation for Queue Length, Stops, and Delay for fixed-Time Traffic Signals, Transportation Research Record
12 May A. D., Geduzlioglu L. T.(1983), Comparative Analysis of Signalized Intersection Capacity Methods, Presented at 62nd Annual Meeting of the Transportation Research Board, Washington, D.C.
13 Douglas R.(1994), Manual of transportation Engineering Studies, Institute of Transportation Engineers
14 Feng-Bor L.(1983), Operational Analysis of Traffic Actuated Signal Control, Traffic Engineering and Control
15 Gerlough D. L., Barnes F. C.(1971), Poisson and Other Distributions in Highway Traffic, Foundation for Transportation
16 Lee J., Chen L. R.(1986), Engineering Headway at Signalized Intersection, Kentucky Research Program, University of Kentucky Lexington
17 건설교통부(1992), 도로용량편람, 대한교통학회