1 |
건설부(1992), '도로용량편람', 한국건설기술연구원 . 교통개발연구원
|
2 |
건설교통부(2000), '도로의 구조 . 시설 기준에 관한 규칙 '해설 및 지침', 기문당
|
3 |
건설교통부,'도로용량편람 개선연구 제1단계 보고서',교통개발연구원,한국건설기술연구원,대한교통학회, 1999.8
|
4 |
건설교통부,'도로용량편람 개선연구 제2단계 보고서',교통개발연구원,한국건설기술연구원,대한교통학회, 2000.9
|
5 |
Transportation Research Board(2000), 'Highway Capacity Manual', Special Report 209., Washington D.C.
|
6 |
Roses, R.P. and Ulerio, J.M.,(1991) 'Capacity of Ramp-Freeway Junction. : NCHRP Project 3-37 Interim Report', Transportation Training and Research Center, Brooklyn, New York
|
7 |
AASHTO, A Policy on Geometric Design of Highways and Streets, 1994
|
8 |
Schoen J.,'Speed-Flow Relationships for Basic Freeway Section',NCHRP 3-45 Final Report, JHK Associates, 1995
|
9 |
Elefteriadou.L.A.,' Probabilistic Model of Breakdown at Freeway-Merge Junctions', Doctoral dissertation. Polytechnic University, Brooklyn,n.y.,June, 1994
|
10 |
Leisch,J., 'Capacity Analysis Techniques for Design and Operation of Freeway Facilities.' FHWA.U.S.Department of Transportation, 1984
|