A Comparison Analysis of Life Cycle Cost (LCC) of Pumps - In the Focus on Comparison of Excellent and General Products in Water Industry -
![]() |
Park, Woopyung
(Graduate School, Kyonggi University, Division of Real Estate and Construction Engineering, Kangnam University)
Choi, Yong (Korean Institute for Water Technology Certification) Jeon, Si Young (Department of Fire Protection and Building Facilities, Suwon Science University) Kim, Jinho (Department of Fire Protection and Building Facilities, Suwon Science University) Kang, Seongmi (Public Projects Division, ITM Corporation) |
1 | Korea Mechanical Construction Contractors Association (2021). The Construction Standard Estimating System(Mechanical Facilities), p. 381. |
2 | Quan, J.L., Choi, S.H., Kwon, T.H., Choi, H.M., Kim, J.H., and Kim, J.J. (2015). "LCCA and LCA to Evaluate Feasibility for Introducing High-Efficiency Motors into Air Ventilation System of Public Facilities." Korean Journal of Construction Engineering and Management, KICEM, 16(4), pp. 41-49. DOI |
3 | Choi, J.Y., Kim, H.B., Son, M.J., and Hyun, C.T. (2015). "Application of Real Option based Life Cycle Cost Analysis for Reflecting Operation Flexibility in Solar Heating Systems." Korean Journal of Construction Engineering and Management, KICEM, 16(4), pp. 70-79. DOI |
4 | Ministry of Environment (2021). Water Industry Statistics Survey, 2020 |
5 | Park, J.J., and Kim, S.B. (2016). "A research & analysis on endurance period of machine equipment and electric equipment about sewage treatment apparatus." Proceedings of KICEM Annual Conference 2016, KICEM, pp. 211-212. |
6 | Statista (2022). Market share of water markets worldwide as of 2020, by subsector. |
![]() |