Abstract
This study analyzed economic feasibility using the real options theory of the eco-environment area project in Saemangeum. I defined the main factors affecting project sales during the 30 years operation period. The real option-based analysis is proposed through the managerial flexibility by estimating the volatility of project sales using scenarios analysis method. The number of visitors, admission fee, leisure program fee, and O&M costs required for economic analysis of eco-environment park were analyzed by reviewing cases of similar eco-environment parks in Korea. The option value is calculated by assuming that the developers have an option right that can be abandoned. B/C is less than 1 and NPV is negative, so it is impossible to proceed with the project using the traditional economic analysis. The project value difference between NPV (-46.6 billion Won) and option value (28.1 billion Won) increased by 74.7 billion Won. Through this study, decision-makers of public institutions and private developers who plan eco-environment area projects will be able to use the real option technique proposed in this study.
Keywords
Saemangeum Eco-Environment Area; Real Options Analysis; Scenario; Volatility;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Amram, M., and Kulatilaka, N. (1999). Real options, Harvard Business School Press, Boston, Massachusetts.
2 Na, H., and Kim, K. (2021). "Economic Sensitivity Analysis of Saemangeum Eco-Environment Area Project(Phase 1)." Proceedings of the 2021 Spring KAIS (Korea Academia-Industrial cooperation Society) Conference, Jeju, Korea, pp. 670-671.
3 Mun, J. (2002). Real options analysis: Tools and techniques for valuing strategic investments and decisions. John Wiley & Sons, Hoboken, NJ.
4 Kim, K. (2021). "Real Options Analysis for the Investment of Floating Photovoltaic Project in Saemangeum." Korean Journal of Construction Engineering and Management, KICEM, 22(1), pp. 90-97.   DOI
5 Kodulula, P., and C. Papudesu (2006). Project Valuation Using Real Options: A Practitioner's Guide, J. Ross Publishing Co., Fort Lauderdale, FL., pp. 101-144.
6 Korea Development Institute (KDI) (2014). Preliminary Feasibility Study Report for Saemangeum Ecological Environment Site Construction Project (Phase 1), Sejong-si, Korea.
7 Kim, K. and Oh, S. (2017). "Economic Assessment for Flood Control Infrastructure under Climate Change : A Case Study of Imjin River Basin." Korean Journal of Construction Engineering and Management, KICEM, 18(2), pp. 81-90.   DOI
8 Saemangeum Development and Investment Agency (SDIA) (2021). Introduction of Saemangeum, Available From:http://www.saemangeum.go.kr, (Accessed Sep. 8, 2021).
9 Suncheonman Wetland (2021). Usage fee from: https://scbay.suncheon.go.kr/wetland/#firstSection, (Accessed Sep. 15, 2021).
10 Kim, K., Park, H., and Kim, H. (2017). "Real options analysis for renewable energy investment decisions in developing countries." Renewable and Sustainable Energy Reviews, 75 pp. 918-926.   DOI
11 Jeonbuk Regional Environment Agency (JREA) (2017). Saemangeum Environmental Ecology Site Operation and Management Plan, Jeonju, Korea.