1 |
Ernst, A., Jiang, H., Krishnamoorthy, M., Nott, H., and Sier, D. (2001). "Rail Crew Scheduling and Rostering Optimization Algorithms." Computer-Aided Scheduling of Public Transport : Part of the Lecture Note in Economics and Mathematical Systems, 505, pp. 53-71.
|
2 |
Heo, N.I. (2000). "A Crew Scheduling Using Set Partitioning." Dep, of Management Information Systems, Graduate School, Dong-A Univ, Pusan, Korea.
|
3 |
Hwang, J.H., and Ryu, K.R. (2004). "A Hybrid of Neighborhood Search and Integer Programming for Crew Schedule Optimization." Journal of Korea Information Science Society : Software and Applications, KISS, 31(6), pp. 829-839.
|
4 |
Hwang, J,H., Park, C.H., Lee, Y.H., and Ryu, K.R. (2002). "Crew Schedule Optimization by Integrating Integer Programming and Heuristic Search." Journal of Korea Information Science Society : Computing Practices and Letters, KISS, 8(2), pp. 195-205.
|
5 |
Hwang, J.H. (2014). "An Integer Programming-based Local Search for the Set Covering Problem." Journal of the Korea Society of Computer and Information, KSCI, 19(10), pp. 13-21.
DOI
|
6 |
Khmeleva, E., Hopgood, A.A. Tipi, L., and Shahidan, M. (2014). "Rail-Freight Crew Scheduling with a Genetic Algorithm." Research and Development in Intelligent Systems 31, pp. 211-223.
|
7 |
Khosavi, A., Tamannaei, M., and Reisi-Nafchi, M. (2016). "A Comprehensive Approach for Railway Crew Scheduling Problem (Case Study : Iranian Railway Network.)" International Journal of Transportation Engineering, IJTE, 4(3), pp. 197-210.
|
8 |
Kim, T.S., Park, K.Y., Park, T.J., and Ryu, K.R. (2011). "Candidate Dia Creation Methods for Subway Crew Scheduling." Journal of Korea Information Science Society, KISS, 38(1C), pp. 299-302.
|
9 |
Lee, D.H., Yang, T.Y., and Kim, Y.H. (2006). "A Study on Korean Railroad Crew Rostering Problem." Journal of the Korean Society for Railway, 9(2), pp. 206-211.
|
10 |
Park, C.H. (2000). "Heuristic Repair Methods for Improving Subway Crew Scheduling." Dep. of Computer Engineering, Graduate School, Pusan National Univ, Pusan, Korea.
|
11 |
Tormos, P., Lova, A., Barber, F., Ingolotti, L., Abril, M., and Salido, M.A. (2008). "A Genetic Algorithm for Railway Scheduling Problems." Metaheuristics for Scheduling in Industrial and Manufacturing Applications : Part of the Studies in Computational Intelligence, 128, pp. 255-276.
|
12 |
Yang, J.Y., and Jo, G.S. (1998). "Knowledge-Based vs. Constraints-Based Scheduling : A Case study of Gate Allocation Problem." Journal of expert systems, 4(2), pp. 45-59.
|