An Empirical Analysis on the Working Conditions of Construction Technician |
Yang, Jinkook
(Research Institute of Construction Technology, Jung Ang Engineering Co., Ltd.)
Lee, Taeshin (Graduate School, Dong-eui University) Lee, Jongmin (Industry & Culture Graduate School, Dong-eui University) Lee, Sangbeom (Department of Architectural Engineering, Dong-eui University) |
1 | Choi, K. J. (2008). "A Study on the Schemes and Analysis of Supply and Demand of Construction Technicians." Master thesis, SEOUL NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY. |
2 | Cho, H. K. (2011). "A Study on Current Supply and Demand Status Problems for Skilled Workers on Construction Sites." Master thesis, NAMSEOUL UNIVERSITY. |
3 | CERIK (2012). "Systematic upbringing and stabilization scheme of income of construction technician." Construction Economy Reserch Institute of Korea, CERIK. |
4 | Ha, G. J., Choi, M. K., and Ha, M. S. (2011). "Comparative Analysis on the Reinforcing bar placer of Frame work in Apartment House." Regional Association of Architectural Institute of Korea Conference Proceeding, AIKRA, pp. 5-6. |
5 | Ha, G. J., Choi, M. K., Ha., M. S., and Ha, J. H. (2012). "Comparative Analysis on the Labor Cost of Workers Frame work in Apartment House." Journal of the Architectural Institute of Korea Conference Proceeding, AIKRA, 32(2), pp. 595-596. |
6 | Kim, D. Y. (2014). "A Basic Study on Investigation of Current Craftmen Status in Construction Site." Journal of the Architectural Institute of Korea Structure & Construction, AIK, 30(11), pp. 81-88. DOI |
7 | Kim, H. C., Hwang Y. K., and Kim, K. R. (2014). "Study on the Application of Multi-skilled labors to Factory Production Process for Securing Economic Feasibility of Modular Unit." Korean Journal of Construction Engineering and Management, KICEM, 15(1), pp. 11-19. DOI |
8 | Kim, K. W., Yu, J. H., and Lee, H. S. (2002). "A Conceptual Approach for Productivity Improvement in Construction Using Multi-Skilled Labor." Journal of the Architectural Institute of Korea Structure & Construction, AIK, 18(7), pp. 163-170. |
9 | Kim, K. W., and Lee, H. S. (2003). "Skill Grouping for Utilizing Multiskilled Labor in Building Construction." Journal of the Architectural Institute of Korea Structure & Construction, AIK, 19(11), pp. 215-222. |
10 | Kim, K. W., and Lee, H. S. (2003). "Optimization model of skill grouping for utilizing multiskilled labor in building construction." Journal of the Architectural Institute of Korea Structure & Construction, AIK, 19(11), pp. 223-230. |
11 | Lim, N. G. (2015). "A fundamental Research for Establishment of a Training System for the Young Construction Technician." Regional Association of Architectural Institute of Korea, AIKRA, 17(6), pp. 179-186. |
12 | Shin, Y. C. (2004). "Improvement scheme for employment environment of construction technician." Construction economy, 49, pp. 49-57. |
13 | Yang, J. K., Kim. S. B., and Lee, S. B. (2017). "An Extraction and ANP Importance Analysis for Competence Factors of Junior Grade CM Engineer." Korean Journal of Construction Engineering and Management, KICEM, 18(1), pp. 58-64. DOI |
14 |
KPI (2018). "Total Price Information." Korea Price Information Corp., |