Browse > Article
http://dx.doi.org/10.6106/KJCEM.2018.19.1.103

A Study on the Change of Non-Working Days Based on the Rainfall in Incheon Area Using the Climate Change Scenarios  

Jang, Junyoung (Department of Architectural Engineering, Incheon National University)
Lee, Chansik (Department of Architectural Engineering, Incheon National University)
Publication Information
Korean Journal of Construction Engineering and Management / v.19, no.1, 2018 , pp. 103-113 More about this Journal
Abstract
In this study, Construction work is mainly done outdoors, so earth works, reinforced concrete works, etc. are Non-Working Days to rainfall. In particular, changes in rainfall due to global warming have made air calculation more difficult. Therefore, when establishing the process plan, the change of the rainfall in the area should be identified and Non-Working Days should be calculated. In this study, the time of rainfall change point was identified using the meteorological 'observation' data from 1960 to 2016 in Incheon and RCP 4.5, 'weather forecast' data from 2018 to 2074, Year rainfall and seasonal rainfall. The results showed that rainfall changed point in 1972, 1988, 2013, 2038, 2050 and 2069. In particular, it has been found that non-working days due to rainfall has big changed point as of 2013, 2038 and 2069.
Keywords
Climatic Change Scenario; RainFall Change; RCP 4.5; BCP; Non-Working Days;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Jung, S, J., Sung, J, H., and Kim, B, S. (2013). "Change Projection of Extreme Indices using RCP Climate Change Scenario." Korea Water Resources Association, 46(11), pp. 1089-1101.
2 Joo, J. G., Kim, S, D., Pack, M, J., and Kim, J, H. (2015). "Evaluation and Calibration Method Proposal of RCP Daily Precipitation Data." Korean Society of Hazard Mitigation, 15(2), pp. 79-91.
3 Kang, U. S. (2004). "The Impact of the Convention on Climate Change on Construction Industry and Appropriate Countermeasures." Korean Society Civil Engineers, 53(4), pp. 24-29.
4 Kim, C. D., Lee, D. H., You, J. S., You, J. K., Jung. J. H., Jung. H. K., and Yu, J. H. (2006). "Calculation of Non-Working Days due to Weather Factors during Structural Steel Works." Korean Journal of Construction Engineering and Management, KICEM, 7(4), pp. 137-145.
5 Kang, W. S. (2007). "The Impacts and Measures of Climate Change on Construction Industry." Construction Economy Research Institute of Korea.
6 Kwon, S. B. (2007). "Study on the Influence of the Weather Factors on Productivity and Number of Working Days in Marine Construction." Dissertation of master degree in Seoul National University of Technology.
7 Barry, D., and Hartigan, J. A. (1993). "A bayesian analysis for change point problems." Journal of the American Statistical Association, 88(421), pp. 309-319.   DOI
8 Bae, D. H., Lee, B. J., and Jung, I. W. (2008). "Analysi s of Construction Conditions Change due to Climate Change." Journal of Civil Engineering, KSCE, 28(4), pp. 513-521.
9 Bang, J. K., Ham, H. D., Lee, J. W., and Kim, K. H. (2010). "Necessity & Efficient Utilization of NonWorking Days by Weather Condition in Building Construction." Korean Journal of Construction Engineering and Management, KICEM, pp. 123-124.
10 Chae, H, M. (2007). "Influence of the Global Warming in Domestic Construction Schedules." Korean Journal of Construction Engineering and Management, KICEM, 11, pp. 567-571.
11 Lee, D. H., You, J. S., You, J. K., Jung, J. H., Jung, H. K., You, J. H., and Kim, C. D. (2005). "Study on Calculation of Non-Working Days for Steel Structure Work with Consideration of Weather Element." Korean Journal of Construction Engineering and Management, KICEM, pp. 244-247.
12 Kim, B. G., Yun, Y. H., and Kim, G. S. (2013) "Estimating the probability of rainfall in Seoul according to climate change scenarios." Korean Society Civil Engineers, 39, pp. 1786-1789.
13 Ko, G. J., and Lee, C. S. (2015). "A Study on the Change of Non-Working Days of Incheon Metropolitan through BCP Analysis." Korean Journal of Construction Engineering and Management, KICEM, 16(4), pp. 80-88.
14 Lee, S. H,. and Kwon, W. T. (2004). "A Variation of Summer Rainfall in Korea." Journal of Korean Geographical Society, 39(6), pp. 819-832.
15 Lee, K. H., Kim, K. R., and Shin, D. W. (2006). "Improvement of Non-Working Day Estimation Affected by Weather Conditions in the Construction Projects in Korea." Korean Journal of Construction Engineering and Management, KICEM, 7(4), pp. 100-108.
16 Lee, J. K,. and Kim, Y. O.(2010). "A Study on Selection of Standard Scenarios in Korea for Climate Change." Journal of Climate Change Research, 1(1), pp. 59-73.
17 Lee, K. M., Sung, J. H., Kim, Y. O., and Lee, S. H. (2011). "Change-point Analysis of Mean Temperature and Extreme Temperature in the Republic of Korea." Journal of Korean Geographical Society, 46(5), pp. 83-596.
18 Lee, G. H. (2013). "Impact of climate change scenarios in the Building Sector." Journal of Korean Geographical Society, 33(2), pp. 64-69.
19 Meteorological Agency (2016). "Climate Prediction." .
20 Climate Change Information Center (2016). "Korea Climate Change Assessment Report." .
21 R Studio (2016). "bcp packages." .
22 Meteorological Agency (2016). "Domestic Climate Incheon Regional Characteristics." .
23 Shin, J. H., Lee, J. A., and Lee, C. S. (2005). "The Estimation of Non-Working days for the Construction Project Incheon Region." Korean Journal of Construction Engineering and Management, KICEM, 6(1), pp. 58-64.
24 Shin, S, H. (2009). "Climate Change and Construction." Korea Association of Air Conditioning Refrigerationg and Sanitary Engineers, 26(5), pp. 74-82.
25 Erdman, C., and Emerson, J. W. (2007). "bcp: A Package for Performing a Bayesian Analysis of Change Point Problems, R package version 1.8.4, URL (http://CRAN. R-procject.org/)" Journal of Korea Water Resources Association, 43(7), pp. 645-655.
26 Cho, H J. (2017). "Evaluation Model of Urban Flood Vulnerability due to Climate Change." Urban Design Institute of Korea.
27 Climate Information Center (2016). "Revised Evaluation Report." .
28 Climate information portal (2016). "Climate change in observation." .
29 Hwang, S. H., Kim, J. H., Yoo, C. S., and Jung, S. W. (2010). "A Probabilistic Estimation of Changing Points of Seoul Rainfall Using BH Bayesian Analysis." Journal of Korea Water Resources Association, 7(216), pp. 645-655.
30 Hwang, S. H., Kim, J. H., Yoo, C., and Jung, S. W. (2010). "A probabilistic estimation of changing points of Seoul rainfall using BH Bayesian analysis." Journal of Korea Water Resources Association, 43(7), pp. 645-655.   DOI
31 Han, B. K., Chung, E. S., Lee, B. R., and Sung, J. H. (2013). "Investigating Changes over Time of Precipitation Indicators." Journal of Wetlands Research, 15(2), pp. 233-250.   DOI
32 Jeong, S, N., and Lee, H. K. (2003). "A Study on the Method of Decision Making for the Optimal Startig Time Considering the Climate elements." Architectural Institute Of Korea, 19(5), pp. 113-120.
33 Jo, K, D., and Jang, H. (2010). "Preliminary study on the current status of climate change and the necessity of adaptation strategies in Incheon." Incheon development institute.
34 Jo, H, K., Kim, S, B., Sin, H, J., and Kim, S, J. (2011). "Projection of Future Snowfall by Using Climate Change Scenarios." Journal of Korean Geographical Society, 14(3), pp.188-202.