Information Retrieval in Construction Hazard Identification |
Kim, Hyun-Soo
(서울대학교 건축학과 대학원)
Lee, Hyun-Soo (서울대학교 건축학과) Park, Moon-Seo (서울대학교 건축학과) Hwang, Sung-Joo (서울대학교 건축학과 대학원) |
1 | Chua, D. K. H. and Goh, T. M. (2002). "Application of case based reasoning in construction safety planning." Proceedings of International Workshop on Information Technology in Civil Engineering 2002, pp. 298-307. |
2 | 안홍섭. (1994). "건설작업 안전정보의 효과적 활용을 위한 지식 모형에 관한 연구"서울대학교 박사학위 논문 |
3 | 안홍섭. (1996). "건설재해사례의 효과적 활용을 위한 사고정보 분류체계에 관한 연구", 대학건축학회 논문집, 12(6), pp. 241-255 |
4 | An, S. (2007). "Integrated safety risk management for construction projects." Ph.D. dissertation, Seoul National Univ., Seoul, Korea. |
5 | 이현수, 김현수, 박문서, 이광표, 이사범(2009). "건설현장위험 영향요소 기반의 위험도 산정 방법론", 한국건설관리학회 논문집, 10(6), pp. 117-126 |
6 | 김현수. (2010). "Influence Factor-Based Safety Risk Assessment Methodology for Construction Sites"서울대학교 석사학위 논문. |
7 | 예태곤. (1998). "사례기반 건설안전 관리시스템의 추론 모형" (Reasoning Model of the Case-Based Construction SAfety Management System) 서울대학교 석사학위 논문. |
8 | 문명완, 김의식, 양극영. (1997). "건설 재해정보 관리시스템 구현에 관한 연구", 대한건축학회 논문집, 13(8), pp.429-440 |
9 | 문명완과 양극영. (1996). "건설공사 재해정보분류체게 구축에 관한 연구", 대한건축학회 논문집, 13(4), pp.429-440 |
10 | Schatterman, D., Herroelen, W., Van de Vonder, S., Boone, A. (2008). "Methodology for integrated risk management and proactive scheduling of construction projects." J. Constr. Eng. Manage., 134(11), pp. 885-893. DOI ScienceOn |
11 | Hallowell, M. R. and Gambatese, A. (2009). "Activity-based safety risk quantification for concrete formwork construction." J. Constr. Eng. Manage., 135(10), pp. 990-998. DOI ScienceOn |
12 | 고성석, 송혁, 이한민. (2005). "재해사례와 위험도 지수를 활용 한 건축공사 안전정보 시스템 개발", 대한건축학회논문집 구조계, 21(6) pp. 113-120 |
13 | Satty, T. L. (1980). The analytic hierachy process, McGraw-Hill, New York. USA. |
14 | Navon, R. and Kolton, O. (2006). "Model for automated monitoring of fall hazards in building construction." J. Constr. Eng. Manage., 132(7), pp. 733-740. DOI ScienceOn |
15 | Navon, R. and Kolton, O. (2007). "Algorithms for automated monitoring of fall hazards." J. Comp. Civ. Eng., 21(1), pp. 21-28. DOI |
16 | Paulson, B. C. (1995). "Computers and construction-Midcareer reflections." J. Constr. Eng. Manage., 121(2), pp. 197-200. DOI ScienceOn |
17 | Sacks, R., Rozenfeld, O. and Rozenfeld, Y. (2009) "Spatial and temporal exposure to safety hazards in construction." J. Constr. Eng. Manage., 135(8), pp. 726-736. DOI ScienceOn |
18 | Lin, K. and Soibelman, L. (2009). "Incorporating domain knowledge and information retrieval techniques to develop and architectural/engineering/construction online product search." J. Comput. Civ. Eng., 23(4), pp. 201-210 DOI ScienceOn |
19 | Manning, C. D., Raghavan, P. and Schutze, H. (2008). Introduction to information retrieval, Cambridge University Press, New York, USA |
20 | McKinney, K. and Fischer, M. (1998). "Generating, evaluating and visualizing construction schedules with CAD tools." Autom. Constr., 7(6), pp. 433-447. DOI ScienceOn |
21 | Kartram, N. A. (1997). "Interating safety and health performance into construction CPM." J. Constr. Eng. Manage., 123(2), pp. 121-126. DOI ScienceOn |
22 | Kolodner, J. L. (1993). Case-Based Reasoning, Morgan Kaufmann |
23 | Carter, G. and Smith., S. D. (2006). "Safety hazard identification on construction projects." J. Constr. Eng. Manage., 132(2), pp. 197-205. DOI ScienceOn |
24 | Chua, D. K. H. and Goh, T. M. (2009). "Case-based reasoning for construction hazard identification: case representation and retrieval" J. Constr. Eng. Manage., 135(11), pp. 1181-1189. DOI ScienceOn |
25 | Eastman, C. Teicholz, P., Sacks, R., and Liston, K. (2008). BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors, John Whiley & Sons Inc., USA, |
26 | Goh, T. M. and Chua, D. K. H. (2010). "Case-based reasoning approach to construction safety hazard identification: adaptation and utilization." J. Constr. Eng. Manage., 136(2), pp. 170-178. DOI ScienceOn |