Checklist of Design Phase for Reducing the Noise and Vibration occurring in Construction |
Oh, Kyung-Taek
(인천대학교 일반대학원)
Ahn, Jeong-Min (인천대학교 일반대학원) Jeong, Jae-Soo (인천대학교 일반대학원) Jung, In-Su (한국건설기술연구원 건설정보연구실) Lee, Chan-Sik (인천대학교 건축공학과) |
1 | Erich Thalheimer (2001), "Proactive and Reactive Construction Noise Control Strategy at the Central Artery/Tunnel Project", Journal of Construction and Materials Issues, pp. 87-95 |
2 | Robert S. Kaplan and David P. Norton (1992), "The Balanced Scorecard-Measures That Drive Performance", Harvard Business Review, Jan-Feb, pp. 71-99 |
3 | Zhen Chen (2000), "Environmental Management of Urban Construction Projects in China", Journal of Construction Engineering and Management, ASCE, vol, 126, No 4, pp. 320-324 DOI ScienceOn |
4 | 중앙환경분쟁조정위원회(2009). " 환경분쟁조정현황" |
5 | 환경부 (2009). "2008년 소음.진동관리시책 시.도별 추진실적 평가" |
6 | 환경부(2006). " 공사장소음.진동관리지침서" |
7 | Creed S. J. (2009), "Risk Index Model for Minimizing Environmental Disputes in Construction", Journal of Construction Engineering and Management, ASCE, Vol. 135, No. 1, pp. 34-41 DOI ScienceOn |
8 | 박현수.정인수.이찬식 (2007), "환경친화적 택지개발사업을 위한 관리항목에 관한 연구", 대한건축학회논문집(구조계), 대한건축학회, 제23권 제12호, pp. 157-164 |
9 | 김재수(2007), " 건설소음.진동실무론", 기문당 |
10 | 고광일.김인호.서상욱.이찬식 (2004), "건설사업의 소음.진동 관리방안에 관한 연구", 한국건설관리학회논문집, 한국건설관리학회, 제5권 제6호, pp. 110-117 과학기술학회마을 |
11 | 안정민.정재수.정인수.이찬식 (2009), "설계단계에서 고려해야 할 공사 중 소음.진동 관리항목", 한국건설관리학회, 추계학술발표대회 |
12 | 오경택.정인수.이찬식 (2009), "설계단계에서의 공사 중 소음.진동관리 실태조사", 한국환경영향평가학회, 추계학술 발표대회 |
13 | 중앙환경분쟁조정위원회(2007). " 환경분쟁조정사례집(제16집)" |
14 | 인천대학교 (2009), "환경친화적 건설사업관리 시스템 개발", 과학재단 |