A Simulation Model for the Application of Concurrent Engineering to Design Phase in Construction  

Han, Jin-Taek (동국대학교 건축공학)
Lee, Jae-Seob (동국대학교 건축공학과)
Publication Information
Korean Journal of Construction Engineering and Management / v.10, no.3, 2009 , pp. 102-110 More about this Journal
Abstract
Although several research efforts have been directed to fast-tracking to reduce the total delivery time, few researches have been studied on concurrent engineering in construction projects. The focus of fast-tracking is primarily on overlapping independent activity pairs. In comparison, the focus of concurrent engineering is on overlapping dependent activity pairs. Dependent activities are much harder to overlap successfully. This paper presents a simulation-based Concurrent Engineering methodology to optimize the overall duration of a set of design activities in a project by modelling key factors that determine the duration of individual activities and overlap between dependent activities. This methodology involves determining how much to overlap activities, how to decide which activities to overlap and the corresponding cost and time tradeoffs using a discrete event model solution. This simulation model, therefore, can be used as a reference on decision-making to define optimum point between time and cost.
Keywords
Concurrent Engineering; Simulation; Overlap; Sensitivity; Evolution;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 김정훈, 구교진, 현창택 (2003). '설계시공 일괄방식 프로세스 성공모델에 관한 연구', 한국건설관리학회 논문집, 제4권 제3호, 119-127   과학기술학회마을
2 남규현, 송성진 (2000). "동시공학 경영혁신 이론과 사례에 관한 연구", 대한건축학회 논문집 16권 12호, 183-194
3 백승호 (1997). "시뮬레이션을 이용한 통계적 코스트 모델의 유효성 검증방법", 대한건축학회 학술발표대회 논문집, 17권 2호, 1511-1517
4 최도승, 이재섭 (2007). '동시공학을 통한 공기단축 의사 결정 모델', 한국건설관리학회논문집, 제8권 제6호, 197-206   과학기술학회마을
5 Eldin, N. N. (1997). 'Concurrent Engineering: A Schedule Reduction Tool.' ASCE Journal of Construction Engineering and Management, 123(3), 354-362   DOI   ScienceOn
6 Maheswari, J. U., Varghese, K., and Sridharan, T. (2006). 'Application of Dependency Structure Matrix for Activity Sequencing in Concurrent Engineering Projects', ASCE Journal of Construction Engineering and Management, 132(5), 482-490   DOI   ScienceOn
7 Blackburn, J. D., editor (1991). Time-Based Competition: The Next Battleground in American Manufacturing, Business One Irwin, Homewood, IL
8 Prasad, B. (1996). Concurrent Engineering Fundamentals: Integrated Product and Process Organization, Prentice Hall, Upper Saddle River, NJ
9 Bogus, S. M., Molenaar, K. R., and Diekmann, J. E. (2006). 'Concurrent Engineering Approach to Reducing Design Delivery Time', ASCE Journal of Construction Engineering and Management, 131(11), 1179-1185   DOI   ScienceOn
10 Barrie, D. S. and Paulson, Jr., B. C. (1992). Professional Construction Management, McGraw-Hill, Inc., New York, NY
11 Lee, J. S., Molenaar, K. R., Bogus, S. M., and Diekmann, J. E. (2006). 'An Activity Overlapping Algorithm for Construction', Joint International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 3827-3836
12 Krishnan, V., Eppinger, S. D., and Whitney, D. E. (1997). 'A Model-Based Framework to Overlap Product Development Activities.' Management Science, 43(4), 437-451   DOI   ScienceOn
13 이국환 (2001). 동시공학기술, 기전연구사
14 Clark, K. B., and Fujimoto, T. (1991). Product Development Performance: Strategy, Organization, and Management in the World Auto Industry, Harvard Business School Press, Boston, MA
15 김기홍 (1992). 신회계이론, 창문각
16 한미파슨스 (2006). Construction Management Best Practice, 기문당
17 변은정 외 (2005). '리모델링 공사에서 Fast Track 적용방안', 대한건축학회 학술발표대회 논문집, 25권 1호, 321-324