Inventory Management in Construction Operations Involving on-site Fabrication of Raw Materials  

Im, Keon-Soon (연세대학교 토목환경공학과 대학원)
Han, Seung-Heon (연세대학교 사회환경시스템공학부)
Jung, Do-Young (대림산업 기술연구소)
Ryu, Chung-Kyu (연세대학교 토목환경공학과 대학원)
Choi, Seok-Jin (연세대학교 토목환경공학과 대학원)
Publication Information
Korean Journal of Construction Engineering and Management / v.9, no.1, 2008 , pp. 187-198 More about this Journal
Abstract
There are usually plenty of material inventories in a construction site. More inventories can meet unexpected demands, and also they may have an economical advantage by avoiding a probable escalation of raw material costs. On the other hand, these inventories also cause negative aspects to increase costs for storing redundant inventory as well as decreasing construction productivity. Therefore, a proper method of deciding an optimal level of material inventories while considering dynamic variations of resources under uncertainty is very crucial for the economical efficiency of construction projects. This research presents a stochastic modelling method for construction operations, particularly targeting a work process involving on-site fabrication of raw materials like iron-rebar process (delivery, cut and assembly, and placement). To develop the model, we apply the concept of factory physics to depict the overall components of a system. Then, an optimal inventory management model is devised to support purchase decisions where users can make timely actions on how much to order and when to buy raw materials. Also, optimal time lag, which minimizes the storage time for pre-assembled materials, is obtained. To verify this method, a real case is applied to elicit an optimal amount of inventory and time lag. It is found that average values as well as variability of inventory level decreased significantly so as to minimize economic costs related to inventory management under uncertain project condition.
Keywords
optimal inventory management; inventory cost; reorder point; optimal time lag;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 김상훈, 김광희, 강경인(2004),'건설공사의 적정 Lot Size 결정에 의한 효율적인 재고관리 방안에 관한 연구', 한국건 축시공학회 논문집, 제4권, 2호, pp. 73-80
2 구본상, 박희성, 장철기, 김대영(2006), '린 건설과 해외 대 규모 건설 공사 적용 사례: 히드로 공항', 대한건축학회논 문집, 제22권, 7호, pp. 141-148
3 한승헌, 류호동, 채명진, 임건순(2006), '6시그마 개념을 도입한 건설공사 생산성 향상에 관한 연구', 대한토목학회논문집, 제26권, 4호, pp. 105-110
4 Arbulu, R.J. and Tommelein, I.D. (2002),'Alternative Supply-Chain Configurations for Engineered or Catalogued Made-To-Order Components: Case Study on Pipe Supports used in Power Plants.'Proceedings of the 11th Annual Conference of the International Group for Lean Construction, Gramado, Brazil
5 Thomas, H.R., Horman, M.J., Ubiraci Espinelli Lemes de Souza, and Ivica Zavrski (2002),'Reducing Variability to Improve Performance as a Lean Construction Principle, Journal of Construction Engineering and Management, Vol. 128, No. 2
6 Arbulu, R.J., Ballard G.H. and Harper, N. (2003), 'Kanban in Construction.' Proceedings of the 11th Annual Conference of the International Group for Lean Construction, Blacksburg, Virginia
7 신용백(2004), 생산운영관리, 범한
8 Moore, J.H. and Weatherfore, L.R. (2001) Decision modeling with microsoft excel. 6th Edition, Prentice- Hall, Englewood Cliffs, N.J
9 Tommelein, I.D., and Weissenberger, M. (1999), 'More just-in-time: Location of buffers in structural steel supply and construction processes', 7th Annual Conf. of the Int. Group for Lean Construction
10 Hopp, W.J and Spearman, M.L. (2000), Factory Physics: Foundation of manufacturing management, 2nd edition, Irwin, Boston
11 이상범(2004),'건설자재의 적정 리드타임 산정에 관한 연 구', 한국건축시공학회논문집, 제4권, 1호