1 |
Cheng, T., Teizer, J., Migliaccio, G. C., and Gatti, U. C. (2013). "Automated task-level activity analysis through fusion of real time location sensors and worker's thoracic posture data."Automation in Construction, 29(0), 24-39.
DOI
|
2 |
Chi, S., and Caldas, C. H. (2011). "Automated Object Identification Using Optical Video Cameras on Construction Sites."Computer-Aided Civil and Infrastructure Engineering, 26(5), 368-380.
DOI
ScienceOn
|
3 |
CII. (2011). A Guide to Construction Rework Reduction. RT252-2b, Construction Industry Institute, the University of Texas at Austin, Austin, TX.
|
4 |
CII. (2013). Best Productivity Practices Implementation Index ? Industrial Projects. RT252- 2c, Construction Industry Institute, the University of Texas at Austin, Austin, TX.
|
5 |
Rezazadeh Azar, E., and McCabe, B. (2012). "Automated Visual Recognition of Dump Trucks in Construction Videos." Journal of Computing in Civil Engineering, 26(6), 769-781.
DOI
|
6 |
Yang, J., Vela, P., Teizer, J., and Shi, Z. (2009). "Vision-Based Crane Tracking for Understanding Construction Activity." Computing in Civil Engineering (2011), American Society of Civil Engineers, 258-265.
|
7 |
Gong, J., and Caldas, C. (2010)." Computer Vision- Based Video Interpretation Model for Automated Productivity Analysis of Construction Operations." Journal of Computing in Civil Engineering, 24(3), 252-263.
DOI
|
8 |
Gong, J., Caldas, C. H., and Gordon, C. (2011). "Learning and classifying actions of construction workers and equipment using Bag-of-Video- Feature-Words and Bayesian network models." Advanced Engineering Informatics, 25(4), 771-782.
DOI
|
9 |
Gouett, M., Haas, C., Goodrum, P., and Caldas, C. (2011). "Activity Analysis for Direct-Work Rate Improvement in Construction." Journal of Construction Engineering and Management, 137(12), 1117-1124.
DOI
|
10 |
Heydarian, A., Golparvar-Fard, M., and Niebles, J. C. (2012). "Automated Visual Recognition of Construction Equipment Actions Using Spatio- Temporal Features and Multiple Binary Support Vector Machines."American Society of Civil Engineers, 889-898.
|
11 |
Jenkins, J. L., and Orth, D. L. (2004)." Productivity Improvement Through Work Sampling."Cost Engineering, 46(3), 27-32.
|
12 |
Liou, F., and Borcherding, J. (1986). "Work Sampling Can Predict Unit Rate Productivity."Journal of Construction Engineering and Management, 112(1), 90-103.
DOI
ScienceOn
|
13 |
Peddi, A., Huan, L., Bai, Y., and Kim, S. (2009). "Development of Human Pose Analyzing Algorithms for the Determination of Construction Productivity in Real-Time." American Society of Civil Engineers, 11-20.
|
14 |
Memarzadeh, M., Golparvar-Fard, M., and Niebles, J. C. (2013)." Automated 2D detection of construction equipment and workers from site video streams using histograms of oriented gradients and colors." Automation in Construction, 32, 24-37.
DOI
|
15 |
Oglesby, C. H. (1989). Productivity improvement in construction. McGraw-Hill series in construction engineering and project management, McGraw-Hill, New York.
|
16 |
Park, M.-W., and Brilakis, I. (2012). "Construction worker detection in video frames for initializing vision trackers." Automation in Construction, 28, 15-25.
DOI
|
17 |
Ranaweera, K., Ruwanpura, J., and Fernando, S. (2013). "Automated Real-Time Monitoring System to Measure Shift Production of Tunnel Construction Projects." Journal of Computing in Civil Engineering, 27(1), 68-77.
DOI
|