System-Level Maintenance Strategy for Steel Bridges based on Life-Cycle Analysis |
Park, Kyung Hoon
(한국건설기술연구원 복합구조연구실)
Lee, Sang Yoon (한국건설기술연구원 복합구조연구실) Kim, Jung Ho (한국건설기술연구원 복합구조연구실) Cho, Hyo Nam (한양대학교 토목환경공학과) Kong, Jung Sik (고려대학교 건축사회환경공학과) |
1 | 건설교통부/한국시설안전기술공단(2003) 안전점검 및 정밀안전진단 세부지침(교량), 건설교통부. |
2 | 박경훈, 이상윤, 김정호, 조효남, 공정식(2006b) 강교량의 최적 유지관리 시나리오 선정 모델, 한국강구조학회논문집, 제18권 6호, pp.677-586. |
3 | 한국건설기술연구원(2006) 강교량의 최적설계와 경제적 유지관리를 위한 생애주기비용 분석 기법 및 시스템 개발, 건설교통부/한국건설교통기술평가원 연구보고서. |
4 | Casas, J. R. (2006) Bridge management: actual and future trends, CD ROM of Bridge Maintenance, Safety, Management, Life-Cycle Performance and Cost, IABMAS, Porto, Portugal. |
5 | Liu, M. and Frangopol, D. M. (2005) Multiobjective maintenance planning optimization for deteriorating bridges considering condition, safety, and life-cycle cost, Journal of Structural Engineering, ASCE, 131(5), pp.833-842. DOI ScienceOn |
6 | 박경훈, 공정식, 황윤국, 조효남(2006a) 생애주기 성능 및 비용에 기초한 교량 유지관리기법 개발, 대한토목학회논문집, 제26 권, 6A호, pp.1023-1032. |
7 | 박경훈, 선종완, 이상윤, 이종순, 조효남(2007) 교량 유지관리 전략 수립을 위한 실용적 도로이용자비용 추정 모델, 한국구조물진단학회논문집, 제11권 6호, pp.131-142. |
8 | Kong, J.-S., Park, K.-H., Lim, J.-K. and Cho, H.-N. (2007) Performance regression model for the optimal maintenance evaluation of steel box bridges, Proc. intern. workshop(LCC5), IABMAS, Seoul, Korea, pp.221-227. |
9 | Ang, A. H-S. and Tang, W.H. (1984) Probability Concepts in Engineering Planning and Design, John Wiley & Sons, New York. |
10 | Transportation Research Board (TRB) (2003) Proceedings of 9th International Bridge Management Conference, Transportation Research Circular No. E-C049, Orlando, Florida. |
11 | Furuta, H., Kameda, T., Fkuda, Y. and Fangopol, D. M. (2004) Life-cycle cost analysis for infrastructure systems: Life Cycle cost vs. safety level vs. service life, Proc. intern workshop(LCC3), IABMAS, Lausanne, Switzerland, pp.19-25. |
12 | Cho, H-N., Frangopol, D. M., and Ang, A. H-S. eds. (2007) Life-Cycle Cost and Performance of Civil Infrastructure Systems, Proceedings of the 5th International Workshop on Life-Cycle Cost Analysis and Design of Civil Infrastructure Systems, Seoul, Korea, October 16-18, 2006. |