1 |
Korea Standards Association, Power Line Communications(PLC) - High speed PLC Medium Access Control(MAC) and Physical Layer(PHY), Part 1: General Requirements, Retrieved Oct., 31, 2007, from http://www.ks.or.kr.
|
2 |
S. Choi, Y. Kim, Y. Kim and H. Oh, "A role of power line communications for implementing the smart grid," in Proc. KICS Winter Conf., pp. 24, Feb. 2011.
|
3 |
Y. Kim, H. Oh, S. Choi, and Y. Kim , "A study on the very high-speed power line communication for electric vehicle charging infrastructure," in Proc. KICS Winter Conf. pp. 279, Feb. 2011.
|
4 |
Smart Grid Roadmap, Retrieved Jan. 25, 2010, from Ministry of Knowledge Economy.
|
5 |
Smart Grid Standardization Forum, http://www.sgstandard.org.
|
6 |
Y. Kim, H. Oh and S. Choi , "A study on the need of architecture design for smart grid communication network," in Proc. KICS Winter Conf. pp. 588, Feb. 2012.
|
7 |
1st Smart Grid Basic Plan, Retrieved July 18, 2012, from Korean Government.
|
8 |
Jeju Smart Grid Test-bed, http://smartgrid.jeju.go.kr.
|
9 |
General Digital Meters for Three Phases and Alternating Power (KOEMA 0511), Retrieved 2011, from Korean Electrical Manufacturers Association.
|
10 |
5th Basic Plan on Electricity Demand and Supply, Retrieved Dec. 28, 2010, from Ministry of Knowledge Economy.
|
11 |
Maintenance Guideline for Confidence Level of Power System and Quality of Electricity, Retrieved Dec. 4, 2009, from the Declaration(2009-280) of Ministry of Knowledge Economy.
|
12 |
Research on information transfer and Power Operation System based on Smart Grid, Retrieved June 14, 2011, from KPX.
|