1 |
Korea Concrete Institue. Concrete working manual, Concrete curing. Korea: Kimoondang; 2010. p. 17-8.
|
2 |
Han MC, Shin YS, Han ID. Estimation of the setting time of the high flowing concrete using durometer. Journal of the Architectural Institute of Korea. 2019 sep;35(9):143-50. https://doi.org/10.5659/JAIK_SC.2019.35.9.143
|
3 |
Lee HJ, Han JH, Kim TW, Lee DY, Jang DB, Han MC. Blast furnace slag using durometer determination of the surface closing time of high fluidity concreate. Proceedings of the Korea Concrete Institute; 2018 May 02-04; Changwon, Korea. Seoul (Korea): Korea Concrete Institute; 2018. p. 353-4.
|
4 |
Han MC, Han ID, Shin YS. Estimation of setting time of concrete using rubber hardness meter. Journals of the Korean Recycled Construction Resources Institute. 2019 Dec;7(4):358-66. https://doi.org/10.14190/JRCR.2019.7.4.358
|
5 |
Han MC, Lee HJ. Setting time evaluation of high flowable ternary concrete mix using durometer. Journals of the Korean Recycled Construction Resources Institute. 2020 Mac;8(1):33-8. https://doi.org/10.14190/JRCR.2020.8.1.33
|
6 |
Lee HJ, Chol YH, Lee YJ, Shin YS, Han MC, Han CG. An analysis on the possibility of using the improved durometer in estimating the setting time according to the temperature variation of high strength concrete. Proceedings of the Architectural Institute of Korea; 2019 Api 26-7; Seoul, Korea. Seoul (Korea): Architectural Institute of Korea; 2019. p. 620-1.
|
7 |
Lee HJ, Sin SJ, Hyun SY, Shin YS, Jang DB, Han MC. Estimation of setting time for concrete replaced by blast-furnace slag using improved durometer. Proceedings of the Architectural Institute of Korea; 2019 Api 26-7; Seoul, Korea. Seoul (Korea): Architectural Institute of Korea; 2019. p. 622-3.
|
8 |
Lee HJ, Han JH, Shin YS, Lee JS, Han ID, Han MC. Estimation of setting time of concrete incorporating blast-furnace slag using improved durometer. Proceedings of the Korea Concrete Institute; 2019 May 08-10: Jeju, Korea. Seoul (Korea): Korea Concrete Institute; 2019. p. 657-8.
|
9 |
Lee HJ, Choi YH, Han JH, Shin YS, Han ID, Han MC. Estimation of setting time of high strength bs concrete through mock-up test using improved durometer. Proceedings of the Korea Concrete Institute; 2019 May 08-10: Jeju, Korea. Seoul (Korea): Korea Concrete Institute; 2019. p. 679-80.
|
10 |
Lee HJ, Shin YS, Seo HG, Han ID, Han MC, Han CG. Utilization of improved durometer when estimating setting time of FA replacement concrete using CGS for fine aggregate. Proceedings of the The Korean Institute of Building Construction: 2019 Oct 31-Nov 01; Chungju, Korea. Seoul (Korea). The Korean Institute of Building Construction; 2019. p. 81-2.
|
11 |
Lee HJ, Lee YJ, Hyun SY, Shin YS, Han MC. Han CG. Estimation of setting time using improved type durometer of fly ash concrete. Proceedings of The Korean Recycled Construction Resources Institute: 2019 Api 03-5; Wonju, Korea. Seoul (Korea). The Korean Recycled Construction Resources Institute; 2019. p. 79-80.
|
12 |
Lee HJ, Choi YH, Lee JS, Han DY, Han ID. Han MC. Estimation of setting time using improved type durometer of powdered high fluidity concrete. Proceedings of The Korean Recycled Construction Resources Institute: 2019 Api 03-5; Wonju, Korea. Seoul (Korea). The Korean Recycled Construction Resources Institute; 2019. p. 17-8.
|