Browse > Article
http://dx.doi.org/10.5345/JKIBC.2016.16.6.487

A Basic Study on the Qualitative Risk Assessment Model for Building Construction Sites Based on Claim Payouts  

Yu, Yeong-Jin (School of Architectural Engineering, University of Ulsan)
Son, Kiyoung (School of Architectural Engineering, University of Ulsan)
Kim, Ji-Myong (Construction Science Department, Texas A&M University)
Publication Information
Journal of the Korea Institute of Building Construction / v.16, no.6, 2016 , pp. 487-495 More about this Journal
Abstract
The losses of accidents in the construction industry was significantly increased during the past decades. Therefore, the study of risk management measures in the domestic construction has become very important, and the inherent risk factors need to derive and analyze them based on the quantified method. However, most studies on the construction risk are conducted finding on the qualitative way. This study analysis the accident records from actual construction sites as a quantities study. A correlation analysis and regression analysis are adopted to identify the risk factors and develop a model. The results of this study are expected to be evolve through the accumulated effect and verification of data in the future through continuous feedback.
Keywords
building construction; risk factors; qualitative risk assessment model; multiple regression analysis;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Online Archive of Korea Statistical Yearbook [Internet]. Daejeon(Korea): Statistics Korea. 2005 [cited 2016 May 1]. Available from: http://www.kostat.go.kr/.
2 Online Archive of Insurance Statistical Monthbook [Internet]. Seoul(Korea): Korea Insurance Development Institute; 2006-[cited 2016 May 1]. Available form: http://www.insis.or.kr/.
3 Ministry of Employment and Labor. Analysis of state industrial accidents. Sejong(Korea): Munjung; 2015 Nov. Chapter 2, Total of state industrial accidents; p. 9-32.
4 Kim CH, Kang LS, Park HT. Development of a Risk Management Procedure Model for the Construction Project Using Construction Risk Management System. Journal of korean society of civil engineers. 2010 Jul;30(4):423-32.
5 Vaughan EJ, Vaughan TM. Essential of Insurance : A Risk Management Perspective. NewYork: John Wiley & Sons, inc.; 1995, p. 43-78.
6 Smith NJ, Merna T, Jobling P. Managing risk in construction projects. 2nd ed. Oxford: Blackwell publishing; 2006. 233 p.
7 Lee HS, Kim HS, Park MS, Lee KP, Lee SB. Construction Risk Assessment Methodology Using Site Risk Influence Factors. Korean journal of construction engineering and management. 2009 Nov;10(6):117-26.
8 Choi HH, Mahadevan S. Construction Project Risk Assessment Using Existing Database and Project-Specific Information. Journal of Construction Engineering and Management. 2008 Nov;134(11):8984-903.
9 Yin YJ, Li Y. Probabilistic loss assessment of light-frame wood construction subjected to combined seismic and snow loads. Engineering Structures. 2011 Feb;33(2):380-90.   DOI
10 Munich Re. NATHAN world map of natural hazards. Munchen (Germany): Munchener Ruckversicherungs -Gesellschaft; 2011, p. 1-7.
11 Kangari R, Riggs LS. Construction risk assessment by linguistics. Ieee transactions on enginnering management. 1989 May;36(2):126-31.   DOI
12 Chan DWM, Chan APC, Lam PTI, Yeung JFY, Chan JHL. Risk ranking and analysis in target cost contracts: Empirical evidence from the construction industry. International Journal of Project Management. 2011 Aug;29(6):751-63.   DOI
13 Online Archive of Onnara information Service [Internet]. Jinju(Korea): Korea Land and Housing Corporation. 2015 [cited 2016 May 1]. Available from: http://www.onnara.go.kr/.
14 Bing L, Akintoye A. Edwards PJ, Hardcastle C. The allocation of risk in PPP/PFI construction projects in the UK. International journal of project management. 2005 Jan;23(1):25-35.   DOI
15 Hsueh SL, Perng YH, Yan MR, Lee JR. On-line multi-criterion risk assessment model for construction joint ventures in China. Auto in construction. 2007 Aug;16(5):607-19.   DOI
16 Akintoye AS, MacLeod MJ. Risk analysis and management in construction. International Journal of Project Management. 1997;15(1):31-8.   DOI
17 Sameh ME. Risk assessment and allocation in the UAE construction industry. International Journal of Project Management 2008 May;26(4):431-8.   DOI