Browse > Article
http://dx.doi.org/10.5345/JKIC.2011.02.1.035

The Management Evaluation Key Performance Indicators of Korean Construction Firms  

Lee, Dong-Hoon (Department of Architectural Engineering, Kyung-Hee University)
Kim, Seon-Hyung (Department of Architectural Engineering, Kyung-Hee University)
Kwon, Gi-Deoc (Department of Architectural Engineering, Kyung-Hee University)
Kim, Man-Ki (Dong-Bu Corporation)
Kim, Sun-Kuk (Department of Architectural Engineering, Kyung-Hee University)
Publication Information
Journal of the Korea Institute of Building Construction / v.11, no.1, 2011 , pp. 35-44 More about this Journal
Abstract
Business performance measurement is used as an important tool to evaluate management performance, control human resources, and implement strategies. It can be measured simply in terms of finance including net profit, return on investment, and return on equity, but this is not sufficient because the performance outside of finance such as internal business process and informatization cannot be examined. Therefore this study defined a KPI(Key Performance Indicators) applicable to local construction companies ranked in the top 30 in construction capability, and also introduced differentiated results from the earlier studies by reflecting more realistic corporate management based on the existing studies and interviews with business experts.
Keywords
Key Performance Index; Management Performance; Construction Firms;
Citations & Related Records
Times Cited By KSCI : 9  (Citation Analysis)
연도 인용수 순위
1 Park MS, Kwon KH, Kwon JH. Courier company's key performance indicators (KPI) Determinants, Korea information society development institute, 2004;1-29.
2 Lee DH, Kim SK, Shin DH. A Correlation Analysis between the Change of Managerial Environment and the Business Performance of Domestic Construction Firms, The Korea Institute of Building Construction, 2009;9(1):111-121.   과학기술학회마을   DOI   ScienceOn
3 Lee DH. An Evaluation Technique of Corporate Management Performance Using Project Information, 2010.
4 Cha WC, Lee JS, Kwon W, Lee JS, Chun JY. Assessment Model of a Construction Company's Management Performance, Architectural Institute of Korea, 2008;28(1):661-664.
5 Robert JW, Thomas JP, Julien RP. Structure is not organization, Business Horizons, 1980;23(3):14-26.   DOI   ScienceOn
6 Cha HS, Kim TK. Developing Measurement System for Key Performance Indicators on Building Construction Projects, Korea Journal of Construction Engineering & Management, 2008;9(4):120-130.   과학기술학회마을
7 Yu IH, Kim KR, Jung YS, Chin SY, Kim YS. A Framework of the Comparable Performance Measurement in the Construction Industry, Korea Journal of Construction Engineering & Management, 2004;5(5):172-182.   과학기술학회마을
8 Yu IH, Kim KR, Jung YS, Chin SY. Key Performance Indicators for Developing Construction Performance Index, Architectural Institute of Korea , 2005;21(2):139-150.   과학기술학회마을
9 Jung WJ, Yu IH, Kim KR, Shin DW. Analysis of the Weights of Performance Measurement Index according to the Size of Construction Companies, Architectural Institute of Korea, 2005;21(8):121-128.   과학기술학회마을
10 Oh IJ, Lee JH, Lee CC. BSC Perspective of an Exploratory study of Developing CSF/KPI Pool in Korean Construction Industry, Korea Society of IT Services, 2006;5(1):35-46.   과학기술학회마을
11 Son MH. A Comparative Analysis of the Whights of Balanced Scorecard Performance Measures According to Corporate life Cycle, The Korean Operations Research and Management Science Society, 2003;28(1):79-96.
12 Shenhar A, Levy O, Dvir D. Mapping the dimensions of project success, Project Management Journal, 1997;28(2):5-13.
13 Ryu SW, Ahn BJ, Ryu MW. Deductions of KPIs for BSC and Process KPIs for BPM in Railway Construction, Koeran society for railway, 2006;9(4):388-393.   과학기술학회마을
14 Kim DK, Kim HJ, Park YW. A Study on the Development of KPI in the Super Deluxe Hotel Business in Seoul Korea Using BSC, Korean Academic Society of Hospitality Administration, 2009;18(3):133-151.
15 Ittner CD, Larcker DF. Innovations in performance measurement: Trends and research implications. Journal of Management Accounting Research 1998;10:205-238.
16 Yu IH, Kim KR, Jung YS, Chin SY. Analysis of Quantified Characteristics of the Performance Indicators for Construction Companies, Korea Journal of Construction Engineering & Management, 2006;7(4):154-163.   과학기술학회마을
17 Kaplan RS, Norton DP. The Balanced Scorecard-Measures that Drive Performance, Harvard Business Review, January-february 1992.
18 Niven PR, Balanced scorecard step-by-step, John Wiley & Sons, New York, 2002.
19 Lee KH, Pyo JH. strategic achievement evaluation system, 21th Books, 1996.
20 Hyun JS. Cause of Success or failure of Construction Management after IMF, Construction Economy Research Institute of Korea, 2002;1-84.