Analysis on Constructability Information and Design Elements by Construction Engineering Task at the Design Phase - Concentrated on Temporary Work in High-rise Building Projects -  

Lee, Jin Woong (조선대학교 건축공학과)
Kim, Taehoon (조선대학교 건축학부)
Cho, Kyuman (조선대학교 건축학부)
Publication Information
Journal of the Regional Association of Architectural Institute of Korea / v.20, no.6, 2018 , pp. 97-104 More about this Journal
Abstract
Recently, as the shape and function of high-rise buildings have become more complex, engineering for reflecting the constructability in the design phase has the increasing importance. However, engineering tasks are not performed at the appropriate level and timing in most projects, which leads to inefficient work such as design changes and reworks. Hence, this study investigated the constructability knowledge, design elements, and supporting tools required to conduct engineering tasks related to temporary work at the design phase, and also analyzed the relationship between these factors using the correlation analysis. As a result, when the engineering tasks are applied in the design phase, constructability knowledge related to 'construction method and process' is the most important and the design factor related to 'layout/arrangement' should be considered as the most important factor. Based on the results of this study, the project participants can efficiently use necessary constructability knowledge during the design phase and facilitate effective decision-making and design alternatives for enhancing constructability.
Keywords
Construction Engineering; Temporary Work; Constructability Information; Design Element; High-rise Building Construction;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Kim, M.H. (2006). Management and Organization of the Building Construction. Kimoondang, 425.
2 Shin, J.W., Ryu, H.G., Lee, D.R. (2008). Informationcentered Design Work Process for Effective Design Management. Journal of the Architectural Institute of Korea, 24(4), pp.133-141.
3 Lee, J.W. (2018). A Process for Integrating Constructability Information into the Design Phase in High-rise Building Construction [Dissertation]. Chosun University, 73, Korea.
4 Kim, T.H., Cho, K.M. (2018). Factors Influencing the Constructability of Temporary Work in the Design Phase of Building Construction. Proceedings of the 12th ISAIA, pp.1878-1881.
5 Lee, J.W., Cho, K.M., Kim, T.H. (2017). Identifying Construction Engineering Tasks at the Design Phase for Enhancing Constructability in High-rise Building Construction. Journal of the Korea Institute of Building Construction, 17(5), pp.453-463   DOI
6 Sohn, Y.J., Jang, K.S. (2008). Understanding of the Temporary Engineering. The Korean Structure Engineers Association, 15(3), pp.80-85.
7 Fischer, M., Tatum, C.B. (1997). Characteristics of Design-relevant Constructability Knowledge. Journal of Construction Engineering and Management, 123(3), pp.253-260.   DOI
8 Pulaski, M.H., Horman, M.J. (2005). Organizing Construct ability Knowledge for Design. Journal of Construction Engineering and Management, 131(8), pp.911-919.   DOI
9 Park, M.S., Ham, Y.J., Lee, H.S., Kim, W.Y. (2010). Development of Design Process Management Model using Dependency Structure Matrix for Constructability. Korean Journal of Construction Engineering and Management, 11(5), pp.65-74.
10 Park, J.S., Hyun, C.T., Hong, T.H., Park, S.H., Moon, H.S. (2009). Development of Checklist for Improving Constructability in Steel Structure Construction. Journal of the Architectural Institute of Korea, 25(12), pp.197-206.