1 |
Yoo, S.Y. (2004). A study of methods for standardization and simplification of construction material bill. Public Procurement Service.
|
2 |
Yoo, S.Y., Lee, J.M., Park, J.T., Han, S.B., Kim, J.G. (2005). Methods for standardization and simplification of construction material bill. Proceeding of SAREK, pp.959-964.
|
3 |
Kwak, S.H., Park, Y. (2005). A study of the simplified method of estimate work in building equipment field. Proceeding of AIK-PK, pp.731-734.
|
4 |
Park, Y., Lee, K.H. (2013). Calculation of the attached pipimg material rate for simplification of estimation work in apartment with individual heating system. Journal of the Regional Association of Architectural Institute of Korea, 15(1), pp.107-114.
|
5 |
Park, Y. (2017). Calculation of the attached piping material rate for the building mechanical service system in office building. Korean Journal of Air-Conditioning and Reffigeration Engineering, 29(4), pp.185-194.
|