A Study on the Analysis of Contract Changing Situation for Public Construction Project  

Jung, Ji-Hyun (동아대학교 대학원 건축공학과)
Lee, Hak-Ki (동아대학교 건축공학과)
Publication Information
Journal of the Regional Association of Architectural Institute of Korea / v.13, no.4, 2011 , pp. 315-322 More about this Journal
Abstract
Because of the characteristics of public construction project, there are many cases of contract change or change orders during the construction. The contract change is accompanied by not only direct expenses but also time extension caused of budget securing problem, etc. during the project, so it increases problems such as the increase of indirect expenses, etc. Therefore, this study drew 7 indexes which can quantify effects and loss made by contract change on construction cost and construction period and inspected and inspected/analyzed adjustment of contract occurred at the stage of construction and occurrence situation by reasons of time extension for pubic cultural sports facilities whose estimated expenses are more than 10 billion. As the result, among the adjustments of contract, construction expenses are greatly increased in case of huge construction, the lowest expenses method and continuous non-construction. And, construction expenses of average 8.8% were increased by change orders of three and four times per a case. The construction period was greatly increased in case of huge construction, turnkey method and long-term continuous construction, so time of average 25.3% per a case was expanded. In this study, contract change at the stage of construction is influenced by systematic inspection, successful bid, contract characteristics, etc. at the stage establishing designing quality and fundamental plan by orderer. Through the minute inspection and additional supplementation for the various reasons, this study will be applied to discriminate and manage Cost Overrun Risk in the future.
Keywords
Public Construction Project; Contract Change; Change Orders; Schedule Extension;
Citations & Related Records
연도 인용수 순위
  • Reference
1 강성원, 공사기간 연장에 따른 간접비 지급 및 산출방안 개선에 관하여, 동양경제연구원, 2010.12
2 김정환, 정부 예산 운용에 따른 계약방식이 건설공사의 공기 및 원가에 미치는 영향에 관한 연구, 중앙대학교 석사학위논문, 2003.12
3 Ting-ya Hiseh, Shin-tong Lu, Chao-hui Wu, Statistical analysis of causes for change orders in metropolitan public works, International Journal of Project Management 22, pp.679-686, 2004   DOI   ScienceOn