1 |
Park C (2007). An algorithm for the properties of the integrated process control with bounded adjustments and EWMA monitoring, International Journal of Production Research, 45, 5571-5587.
DOI
|
2 |
Reynolds MR and Arnolds JC (2001). EWMA control charts with variable sample sizes and variable sampling intervals, IIE Transactions, 33, 511-530.
DOI
|
3 |
Park C, Lee J, and Kim Y (2004). Economic design of a variable sampling rate EWMA chart, IIE Transactions, 36, 387-399.
DOI
|
4 |
Park CS and Reynolds MR (2008). Economic design of an integrated process control procedure with repeated adjustments and EWMA monitoring, Journal of the Korean Statistical Society, 37, 155-174.
DOI
|
5 |
Reynolds MR (1996). Variable-sampling-interval control charts with sampling at fixed time, IIE Transactions, 29, 497-510.
DOI
|
6 |
Woodall WH and Reynolds MR (1983). A discrete Markov chain representation of the sequential probability ratio test, Sequential Analysis: Design Methods and Applications, 2, 27-44.
|