1 |
Park, C. (2007). An algorithm for the properties of the integrated process control with bounded adjustments and EWMA monitoring, International Journal of Production Research, 45, 5571-5587.
DOI
ScienceOn
|
2 |
Park, C., Lee. J. and Kim. Y. (2004). Economic design of a variable sampling rate EWMA chart, IIE Transactions, 36, 387-399.
DOI
ScienceOn
|
3 |
Park, C. S. and Reynolds, M. R. (2008). Economic design of an integrated process control procedure with repeated adjustments and EWMA monitoring, Journal of the Korean Statistical Society, 37, 155-174.
과학기술학회마을
DOI
ScienceOn
|
4 |
Reynolds, M. R. (1996). Variable-sampling-interval control charts with sampling at xed time, IIE Trans-actions, 29, 497-510.
|
5 |
Reynolds, M. R. and Arnolds, J. C. (2001). EWMA control charts with variable sample sizes and variable sampling intervals, IIE Transactions, 33, 511-530.
|
6 |
Woodall, W. H. and Reynolds, M. R. (1983). A discrete Markov chain representation of the sequential probability ratio test, Sequential Analysis: Design Methods and Applications, 2, 27-44.
|