1 |
J. Kim, "An assessment method to evaluate team project based engineering design," in Proceedings of International Conference on Computer Science and Education, Vancouver, pp. 257-260, 2014.
|
2 |
W. G. Dyer, W. G. Dyer Jr., and J. H. Dyer, Team Building: proven strategies for improving team performance. 4th ed. San Francisco: Jossey-Bass, 2007.
|
3 |
B. W. Tuckman, "Developmental Sequence in Small Groups," Psychological Bulletin, vol. 63, pp. 384-399, 1965.
DOI
|
4 |
B. W. Tuckman and M. A. C. Jensen, "Stages in Small Group Development Revisited," Group and Organizational Studies, vol. 2 pp. 419-427, 1977.
|
5 |
J. Borges, T. G. Dias, and J. F. Cunha, "A new groupformation method for student projects," European Journal of Engineering Education, vol. 34, issue 6, pp. 573-585, 2009.
DOI
|
6 |
S. Pociask, D. Gross, and M. Shih, "Does Team Formation Impact Student Performance, Effort and Attitudes in a College Course Employing Collaborative Learning?," Journal of the Scholarship of Teaching and Learning, vol. 17, no. 3, pp. 19-33, 2017.
DOI
|
7 |
J. Kim, "Exception Handling Education Approach Incorporating Role-Changing Brainstorming Technique in HCI Design Process," International Journal of Multimedia and Ubiquitous Engineering, vol. 9, no. 6, pp. 159-170, 2014.
DOI
|