1 |
Desmond D'Souza, Objects, Components, & Frameworks with UML, Addison-Wesley, Longman, Incorporated, (1998), 1-816
|
2 |
Euwe, Mark, J., Paul A.L. Jansen Christian, and T. H. Veldkamp, 'The Value of Rescheduling Functionality within Standard MRP Packages,' Production Planning and Control 9, 4(1998), 328-334
DOI
|
3 |
Lapedes, A. and R. Farber, How Neural Nets Work, Technical Report Los Almas National Laboratory, (January 1988), 331-346
|
4 |
Lee, I., and M.J. Shaw, 'A Neural-net Approach to Real Time Flow-shop Sequencing,' Computers & Industrial Engineering 38 (2000), 125-147
DOI
ScienceOn
|
5 |
Rakshit, A., N. Krishnamurthy, and G. Yu, 'Systems Operations Advisor: A Real-Time Decision Support System for Managing Airline Operations at United Airlines,' Interface 26, 2(1996), 50-58
|
6 |
Wang, G. 'An Adaptive Hybrid Neural Network Approach to Prediction of Nonstationary Processes,' Hybrid Intelligent System Applications, Edited by Dr. Jay Liebowitz, Cognizant Communication Corporation, (1996), 140-161
|
7 |
Kouvelis, P., and Gang Yu, Robust Discrete Optimization and Its Applications, Kluwer Academic Publishers, 1997
|
8 |
Luo, S. and G. Yu, 'On the Airline Schedule Perturbation Problem Caused By the Ground belay Program,' Transportation Science 31, 4(1997), 298-311
DOI
ScienceOn
|
9 |
Narendra, K. S. and K. Parthasarathy, Identification and Control of Dynamical Systems using Neural Networks, IEEE. Transactions all Neural Networks 1 (1990), 4-27
DOI
PUBMED
|
10 |
Yoshtaka, Kuwata and Hiroki Oohama, 'A case study of a real-time problem solving strategy in an air traffic control problems,' Expert Systems with Applications 12, 1 (1997), 71-79
DOI
ScienceOn
|
11 |
Lynn Ling X Li, 'Proposing an Architectural Framework of a Hybrid Knowledge-based System for Production Rescheduling,' Expert Systems 16, 4(1999), 273-279
DOI
|
12 |
Yu, G. 'A General Advanced Integrated Real-Time Decision Support Systems (AIRDSS) Framework for Real-Time Operations Control,' White Paper for CALEB Technologies Corp. (2000)
|
13 |
Cao, J. and A. Kanafani, 'Real-Time Decision Support for Integration of Airline Flight Cancellation and Delay Part II: Algorithm and Computational Experiments,' Transportation Planning and Technology 20 (1997), 201-217
DOI
ScienceOn
|
14 |
Thengvall, Benjamin G., Jonathan F. Bard and Gang Yu, 'Balancing User Preferences for Aircraft Schedule Recovery during Irregular Operations,' IIE Transactions 32, (2000), 181-193
DOI
|
15 |
Carrvilla, M. A. and J. P. Sousa, 'Hierarchical Production Planning in a Make-to-Order Company: Case Study,' European Journal of Operational Research 86 (1996), 43-56
DOI
ScienceOn
|
16 |
Arguello, M. F., J. F. Bard, and Gang Yu, 'Models ad Methods for Managing Airline Irregular Operations Aircraft Routing,' in Operations Research in Airline Industry: Gang Yu (Ed), Kluwer Academic Publisher, Boston, MA, (1997), 1-45
|
17 |
Cao, J. and A. Kanafani, 'Real-Time Decision Support for Integration of Airline Flight Cancellation and Delay Part I: Mathematical Formulations,' Transportation Planning and Technology 20 (1997), 183-199
DOI
ScienceOn
|
18 |
Lapedes, A. and R. Farber, Nonlinear Signal Processing Using Neural Networks: Prediction and System Modelling, Preprint LA-UR-87-2662, 1987
|
19 |
Christian H. Timple and Joseph Kallrah, 'Optimal Planning in Large Multi-Site Production Networks,' European Journal of Operational Research 126 (2000), 422-435
DOI
ScienceOn
|
20 |
Averbakh, I. and Oded Berman 'Algorithms for the robust 1-centered problem on a tree,' European Journal of Operational Research 123 (2000), 292-302
DOI
ScienceOn
|
21 |
Arguello, M. F., J. F. Bard, and Gang Yu, 'A GRASP for Aircraft Routing in Response to Groundings and Delays,' Journal of Combinatorial Optimization, (1997), 211-228
DOI
|
22 |
Yan, S. and D. Yang, 'Decision Support Framework for Handling Schedule Perturbations,' Transportation Research. Part b: Methodology 30, 6(1996), 405-419
DOI
ScienceOn
|
23 |
Kouvelis, P., and G. Yu, Discrete Optimization and its Applications. Kluwer Academic Publishers, Dordrecht, 1997
|