A Study on the Measurement of Contact Force of Pantograph on High Speed Train |
Seo Sung-Il
(Conventional Rail Engineering Department, Korea Railroad Research Institute)
Cho Yong-Hyun (Electrical & Signal Research Department, Korea Railroad Research Institute) Mok Jin-Yong (High Speed Rail Engineering Department, Korea Railroad Research Institute) Park Choon-Soo (High Speed Rail Engineering Department, Korea Railroad Research Institute) |
1 | UIC, 1996, 'Pantograph - Overhead Line Interaction on the European High Speed Network,' International Union of Railway, UIC 794, pp.1-30 |
2 | Kim, J. W., Park, I. K., Jang, J. H., Wang, Y. Y. and Han, C. S., 2003, 'A Modeling and Contact Force Analysis of the Catenary-pantograph System for a High Speed Rail Vehicle,' Transactions of the Korean Society for Noise and Vibration Engineering, Vol. 13, No.6, pp. 474-483 과학기술학회마을 DOI |
3 | Kim, K. H., Jung, G. R. and Lee, B. S., 2002, 'System Specification for G7 Korean High Speed Train,' Korea Railroad Research Institute Report, pp. 51-53 |
4 | Park, T. J., Kim, B. J. and Wang, Y. Y., 2002, 'A Catenary System Analysis for Studying the Dynamic Characteristics of a High Speed Rail Pantograph,' KSME International Journal, Vol. 16, No.4, pp. 436-447 과학기술학회마을 |
5 | Seo, S. I., Park, C. S., Cho, Y. H., Choi, K. Y. and Mok, J, Y., 2003, 'Test and Evaluation of the Pantograph for Korea High Speed Train,' Journal of the Korean Society for Railway, Vol. 6, No.2, pp.94-99 과학기술학회마을 |
6 | Alstom, 2001, 'Qualification Test ProcedureTrainset Pantograph Test,' Korea High Speed Rail Specification, K651-1-E5330-RB+T-017, pp.28-30 |
7 | Bae, J. C., lung, G. R. and Kim, H. J., 2001., 'Development of Pantograph for Korea High Speed Train,' Korea Ministry of Construction and Transportation Report, No.00-1l-2-1-10, pp.119-133 |
8 | Ikeda, M. and Usuda, T., 2000, 'Study on the Method of Measuring the Contact Force between Pantograph and Contact Wire,' RTRI Report, Vol. 14, No.6, pp. 7-12 |