Browse > Article

On the Full Stand Modeling and Tension Control for the Hot Strip Finishing Mill with PID Structure  

Ahn, Byoung-Joon (Department of Mechanical and Intelligent Systems Engineering, Pusan National University)
Park, Ju-Yong (Department of Mechanical and Intelligent Systems Engineering, Pusan National University)
Chang, Yu-Shin (Department of Mechanical and Intelligent Systems Engineering, ERC/NSDM Pusan National University)
Lee, Man-Hyung (School of Mechanical Engineering, Pusan National University)
Publication Information
Journal of Mechanical Science and Technology / v.18, no.7, 2004 , pp. 1062-1073 More about this Journal
Abstract
We describe a looper controller design for a hot strip finishing mill in steel plants. The main function of the looper system is to balance the mass flow of the strip by accumulating material in the middle of the stands. Another function is to control the strip tension which influences the width of the strip. To ensure strip quality, it is very important to control the tension of the hot strip finishing mill. However, because there is a mutual interaction between the looper angle and the strip tension, it is difficult to control the looper system. Previous researches examined only the operation of a single stand. But it is not sufficient to examine the operation and effect of whole stands because the operation is wholly interdependent. In this paper, we present a full model of the hot strip finishing mill in order to more effectively control strip tension. We propose several control methods for the full-stand hot strip finishing mill, denoted as conventional PI, PI with cross gain, and coefficient diagram method (CDM) PID control. In the real plants, there are some problems by using higher order controllers such as LQ, LQG and H$\_$$\infty$/. By comparison, the PID controller is very simple and easy to apply to all real plants. To that end, we present our findings on PID controls and their potential use in the hot strip finishing mill.
Keywords
Hot Strip Finishing Mill; Tension; Looper System; Conventional PI; Cross Control; CDM;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Hearns, G. and Grimble, M. J., 1997, ' Multivariable Control of a Hot Strip Finishing Mill,' Proceedings of the American Control Conference Albuquerque, New Mexico, pp. 3775-3779   DOI
2 Hesketh, T., Jiang, Y. A., Climents, D. J., Buter, D. H. and van der Laan,R., 1998, 'Controller Design for Hot Strip Finishing Mills,' IEEE Trans. on Control System Technology, Vol. 6, No. 2, pp. 208-219   DOI   ScienceOn
3 Manabe, S., 1998, 'Coefficient Diagram Method,' Proc. of 14th IFAC Symposium on Automatic Control in Aerospace, pp. 199-210
4 Man Hyung Lee, 2001, Development of a High Precision Automatic Control System for Hot Strip Mill Finisher, RIMT, Pusan National University (The last report of first year), in Korea
5 Masanoti Shioya, Naohatu Yohitani, and Takatsugu Ueyama, 1995, 'Noninteracting Control with Disturbance Compensation and its Application to Tension-Looper Control for Hot Strip Mill,' IEEE, pp. 229-234   DOI
6 Myungjun, H., 1998, 'A CDM for High-Order Plant,' Porc. of the 13th KACC, pp. 793-795, in Korea
7 Young-Chol Kim, 2001, 'Application of CDM to MIMO System : Control of Hot Rolling Mill,' Transactions on Control, Automation and Systems Engineering, Vol. 3, No. 4, pp. 250-256, in Korea
8 Manabe,S., 1997, An Algebraic Approach to Control System Design ; Coefficient Diagram Method, (Lecture note), Chungbuk National University, in Korea
9 Shin, K. H., Hong, W. K., 1998, 'Real-Time Tension Control in a Multi-Stand Rolling System,' KSME International Journal, Vol. 12, No. 1, pp. 12-21, in Korea   과학기술학회마을   DOI