1 |
Ding, L., Wang, A.M., Ning, R.X., 2010. Job-shop scheduling technology with uncertain processing time. Comput. Integr. Manuf. Syst. 16 (1), 98-108.
|
2 |
Driessel, R., Monch, L., 2012. An integrated scheduling and material-handling approach for complex job shops: a computational study. Int. J. Prod. Res. 50 (20), 5966-5985.
DOI
|
3 |
Erol, R., Sahin, C., Baykasoglu, A., Kaplanoglu, V., 2012. A multi-agent based approach to dynamic scheduling of machines and automated guided vehicles in manufacturing systems. Appl. Soft Comput. 12 (6), 1720-1732.
DOI
|
4 |
Jia, Y.R., Jiang, Z.Y., 2009. Research on application of reconfigurable manufacturing execution system in plane block production line. Shipbuild. Tech. 287 (1), 39-41.
|
5 |
Luo, L., 2011. Application of man-hour and output analysis in plane block production line. Guangdong Shipbuild. 30 (1), 66-68.
|
6 |
Lee, K., Shin, J.G., Ryu, C., 2009. Development of simulation-based production execution system in a shipyard: a case study for a panel block assembly shop. Prod. Plan. Control 20 (8), 750-768.
DOI
|
7 |
Liu, L.G.H.X.Y., 2008. Rescheduling algorithm based on rolling horizon decomposition for a dynamic job shop with uncertain arriving time. Chin. J. Mech. Eng. 44 (5), 68-75.
|
8 |
Ozkok, M., Helvacioglu, I.H., 2013. Determination of the effects of the pre-outfitting and pre-piping assembly operations on shipyard productivity. Pol. Marit. Res. 20 (1), 59-69.
|
9 |
Qian, B., Ling, W., Xian, H.D., Jiang, Y.H., Xiong, W., 2009. Rolling strategy and optimization algorithm for dynamic no-wait flow shop scheduling problem. Control Decis. 24 (4), 481-487.
|
10 |
Wu, G.B., 2011. Brief analysis on production management of shipbuilding panel production flow line. Guangdong Shipbuild. 30 (3), 70-73.
|
11 |
Zhang, Z.Y., Liu, D.Q.,L.I., 2012. Research on non-completely hybrid flow line scheduling of panel block in shipbuilding. Comput. Integr. Manuf. Syst. 18 (11), 2435-2445.
|
12 |
Zhao, D., 2012. Application of systems engineering in the panel production line. Jiangsu Ship 29 (2), 9-11.
|
13 |
Zhou, W., He, J., Liu, S., Wang, X., 2009. A dynamic schedule based on integrated time performance prediction. In: 1st International Conference on Information Science and Engineering (ICISE). IEEE, pp. 1-4.
|