1 |
Zhao, Y.W., Wang, H.Y, Xu, X.L. and Wang, W.L., 2010. A new hybrid parallel algorithm for consistent-sized batch splitting job shop scheduling on alternative machines with forbidden intervals. The International Journal of Advanced Manufacturing Technology, 48(9-12), pp.1091-1105.
DOI
|
2 |
Lee, K.K., Shin, J.G. and Ryu, C., 2009. Development of simulation based production execution system in a shipyard: a case study for a panel block assembly shop. Production Planning & Control, 20(8), pp.750-768.
DOI
ScienceOn
|
3 |
Manesis, S., Akantziotis, K., 2005. Automated synthesis of ladder automation circuits based on state-diagrams. Advances in Engineering Software, 36(4), pp.225-233.
DOI
ScienceOn
|
4 |
Meng, X., 2010, Modeling of reconfigurable manufacturing systems based on colored timed object-oriented Petri nets. Journal of Manufacturing Systems, 29(2-3), pp.81-90.
DOI
ScienceOn
|
5 |
Lee, J.M., 2007. An integrated process and measurement framework for planning production of large shipyards. PhD thesis. Seoul National University.
|
6 |
Ramaswamy, S., Valavinis, K.P. and Barer, S., 1997. Petri net extensions for the development of MIMO net models of automated manufacturing systems. Journal of Manufacturing Systems, 16(3), pp.175-191.
DOI
ScienceOn
|
7 |
Reddy, J.P., Kumanan, S. and Chetty, O.V.K., 2001. Application of petri nets and a genetic algorithm to multi-mode multiresource constrained project scheduling. The International Journal of Advanced Manufacturing Technology, 17, pp. 305-314.
DOI
|
8 |
Shin, J.G., Kwon, O.H. and Ryu, C., 2008. Heuristic and metaheuristic spatial planning of assembly blocks with process schedules in an assembly shop using differential evolution. Production Planning & Control, 19(6), pp.605-615.
DOI
ScienceOn
|
9 |
Song, Y.J., Woo, J.H. and Shin, J.G., 2009. Research on a simulation-based ship production support system for middle sized shipbuilding companies. International Journal of Naval Architecture and Ocean Engineering, 1(2), pp.70-77.
DOI
ScienceOn
|
10 |
Venkatesh, K. and Ilyas, M., 1995. Real time Petri nets for modeling, controlling, and simulation of local area networks in FMS. Computers & Industrial Engineering, 28(1), pp.147-162.
DOI
ScienceOn
|
11 |
Cecil, J.A., Srihari, K. and Emerson, C.R., 1992. A review of petri net applications in manufacturing. The International Journal of Advanced Manufacturing Technology, 7(3), pp.168-177.
DOI
|
12 |
Guldogan, E.U., 2011. An integrated approach to machine selection and operation allocation problem. The International Journal of Advanced Manufacturing Technology, 55, pp.797-805.
DOI
|
13 |
Google maps, 2005. [online] available through:
|
14 |
Kiritsis, D., Neuendorf, K.P. and Xirouchakis, P., 1999. Petri net techniques for process planning cost estimation. Advances in Engineering Software, 30(6), pp.375-387.
DOI
ScienceOn
|
15 |
Lee, D.H., Kang, Y.W. and Kim, H.J., 2005. Block Assignment planning for shipbuilding considering preference shop and load balancing. Daewoo Shipbuilding & Marine Engineering Research report, 61(2), pp.32-41.
|
16 |
Kiritsis, D. and Porchet, M., 1996. A generic Petri net model for dynamic process planning and sequence optimization. Advances in Engineering Software, 25(1), pp.61-71.
DOI
ScienceOn
|
17 |
Lamb, T., Chung, H., Spicknall, M., Shin, J.G., Woo, J.H., and Koenig, P. 2006. Simulation-based performance improvement for shipbuilding processes. Journal of Ship Production, 22(2), pp.49-65.
|