Comparative Study of GPS-Integrated Concrete Supply Management using Discrete Event Simulation |
Zekavat, Payam Rahnamayie
(School of Civil and Environmental Engineering, UNSW)
Mortaheb, Mohammad Mehdi (School of Civil and Environmental Engineering, Sharif University of Technology) Han, Sangwon (Dept. of Architectural Engineering, University of Seoul) Bernold, Leonhard (Dept. of Civil Engineering, Universidad Tecnica FSM) |
1 | C.T. Hyun, T.H. Hong, S.M. Ji, J.H. Yu, S.B. An, "The Development of Probabilistic Time and Cost Data: Focus on field conditions and labor productivity" Journal of Construction Engineering and Project management, vol. 1, no. 1, pp. 37-43, 2011. |
2 | K.J. Yi, "Modelling of On-Site Energy Consumption Profile in Construction Sites and a Case Study of Earth Moving", Journal of Construction Engineering and Project management, vol. 3, no. 3, pp. 10-16, 2013. |
3 | A.M. Hajji, M.P. Lewis, "Development of Productivity-based Estimating Tool for Fuel Use and Emissions from Earthwork Construction Activities", Journal of Construction Engineering and Project management, vol. 3, no. 2, pp. 58-65, 2013. DOI ScienceOn |
4 | Masternaut Connect, http://www.masternaut.com. |
5 | T.L. Saaty , "The Analytical Hierarchy Process: Planning, Priority Setting, and Resources Allocation", McGraw-Hill, New York, 1980. |
6 | J.U.D. Hatmoko, S. Scott, "Simulating the impact of supply chain management practice on the performance of medium‐sized building projects", Construction Management and Economics, vol. 28, no. 1, pp. 35-49, 2010. DOI ScienceOn |
7 | E.W.L. Chan, "Action Research: the Use of Enterprise Resource Planning System in Construction Engineering and Project Management", Journal of Construction Engineering and Project management, vol. 1, no. 3, pp. 19-27, 2011. |
8 | T.H. Shin, S.W. Yoon, S. Chin, "A Construction Supply Chain Management Process with RFID/WSN-based Logistics Equipment", Journal of Construction Engineering and Project management, vol. 2, no. 4, pp. 11-19, 2012. DOI ScienceOn |
9 | N. Kasim, "ICT Implementation for Materials Management in Construction Projects: Case Studies", Journal of Construction Engineering and Project management, vol. 1, no. 1, pp. 31-36, 2011. DOI ScienceOn |
10 | M. Anson, S.L. Tang, K.C. Ying, "Measurement of the performance of ready mixed concreting resources as data for system simulation", Construction Management and Economics, vol. 20, no. 3, pp. 237-50, 2002. DOI ScienceOn |
11 | M. A. Ammar, Y.A. Mohieldin, "Resource constrained project scheduling using simulation", Construction Management and Economics, vol. 20, no.4, pp. 323-30, 2002. DOI ScienceOn |
12 | M. Park, W. Kim, H. Lee, S. Han, "Supply chain management model for ready mixed concrete", Automation in Construction, vol. 20, no. 1, pp. 44-55, 2011. DOI ScienceOn |
13 | L.E. Bernold, "Simulation of non-steady construction processes", Journal of Construction Engineering and Management, vol. 115, no. 2, pp. 163-78, 1986. |
14 | D. Arditi, D. Lee, G. Polat, "Fatal accidents in nighttime vs. Daytime highway construction work zones', Journal of Safety Research, vol. 38, no. 4, pp. 399-405, 2007. DOI ScienceOn |
15 | S.L. Tang, K.C. Ying, M. Anson, M. Lu, "RMCSIM: A simulation model of a ready‐mixed concrete plant serving multiple sites using multiple truckmixers", Construction Management and Economics, vol. 23, no. 1, pp. 15-31, 2005. DOI ScienceOn |
16 | L.E. Bernold, S. AbouRizk, "Managing Performance in Construction", Wiley, Hoboken, New Jersey, ISBN 978-0-470-17164-6, 2010. |
17 | J. Jackson, "Nighttime road construction: current issues", Centre for Transportation Research and Education Iowa State University, 2005. |
18 | L. Bernold, "Construction Equipment and Methods", John Wiley & Sons, Inc., ISBN 978-0-470-16986-5, 2013. |
19 | M.R. Manavazhi "Hybrid modelling framework for synthesizing virtual structures", Construction Management and Economics, vol. 18, no. 4, pp. 415-26, 2000. DOI |
20 | J. Martinez, P.G. Ioannou, "General purpose simulation with stroboscope", Proceedings of the Winter Simulation Conference, IEEE, Piscataway, pp. 1159-66, 1994. |
21 | Anylogic Version 6 - Manual. XJ Technologies, http://www.xjtek.com/ , 2008. |
22 | S. D. Smith, "Earthmoving productivity estimation using linear regression techniques", Journal of Construction Engineering and Management, vol. 125, no. 3, pp. 133-41, 1999. DOI ScienceOn |
23 | J.W. Hinze, D. Carlisle, "An evaluation of the important variables in nighttime construction", Seattle, WA: Transportation Northwest, Department of Civil Engineering, University of Washington, 1990. |