Browse > Article
http://dx.doi.org/10.5370/JEET.2016.11.5.1084

A Novel Method for Deriving Optimal Synchronism-Check Phase Angle in Transmission System  

Oh, Yun-Sik (College of Information and Communication Engineering, Sung- kyunkwan University, Korea.)
Gwon, Gi-Hyeon (College of Information and Communication Engineering, Sung- kyunkwan University, Korea.)
Kim, Chul-Hwan (Corresponding Author: College of Information and Communication Engineering, Sungkyunkwan University, Korea.)
Yang, Jeong-Jae (Korea Power eXchange.)
Publication Information
Journal of Electrical Engineering and Technology / v.11, no.5, 2016 , pp. 1084-1092 More about this Journal
Keywords
EMTP; Optimal synchronism-check phase angle; Autoreclosing; Synchronism-check; Transmission system;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 “Single phase tripping and auto reclosing of transmission lines-IEEE Committee Report”, IEEE Trans. Power Delivery, Vol. 7, pp. 182-192, Jan. 1992.   DOI
2 S. P. Ahn, C. H. Kim, R. K. Aggarwal, A. T. Johns, “An Alternative Approach to Adaptive Single Pole Auto-Reclosing in High Voltage Transmission Systems Based on Variable Dead Time Control”, IEEE Trans. On Power Delivery, vol. 16, no. 4, pp. 676-686, Oct. 2001.
3 R. K. Aggarwal, Y. H. Song, A. T. Johns, “Adaptive Three-phase Autoreclosure for Double-circuit Transmission Systems using Neural Networks”, in Proc. 1993 IEE Advances in Power System Control, Operation and Managements Conf., pp. 389-392, 1993.
4 M. B. Djuric, Z. M. Radojevic, V. V. Terzija, “Arcing Faults Detection on Transmission Lines Using Least Error Squares Technique”, European Transactions on Electrical Power, 1998, 8, (6), pp. 437-443.   DOI
5 IEEE Std. C37.104-2012, “IEEE Guide for Automatic Reclosing of Circuit Breakers for AC Distribution and Transmission Lines”, 2012.
6 Z. Y. Xu, X. Zhang, X. Q. Yan, A. Wen, “Optimal compensating scheme for limiting secondary arc current of 1000-kV UHV short parallel lines”, IET Generation, Transmission & Distribution, 2012, 6, (12), pp. 1235-1242.   DOI
7 P. M. Anderson, “Power System Protection”, Power Math Associates, Inc.
8 FERC & NERC, “Arizona-Southern California Outages on September 8, 2011”, April, 2012.
9 Ta-Hsiu Tseng, Pei-Hwa Huang, Yu-Heng Chang, “Analysis of Effects of Synchronism Conditions on Power System Operation”, In proc. SICE Annual Conference, pp. 1416-1419, 2011.
10 S. Jamali, A. Parham, “New approach to adaptive single pole auto-reclosing of power transmission lines”, IET Generation, Transmission & Distribution, 2010, 4, (1), pp. 115-122   DOI
11 Petricia Mestas, Maria Cristina Tavares, Aniruddha M. Gole, “Implementation and Performance Evaluation of a Reclosing Method for Shunt Reactor-Compensated Transmission Lines,” IEEE Trans. Power Delivery, Vol. 26, No. 2, pp. 954-962, April, 2011.   DOI
12 M. Djuric, Z. Radojevic, K. Zoric, “Determination of the Arc Extinction Time on Power Lines Using Voltage Signals”, European Transactions on Electrical Power, 2002, 12, (6), pp. 973-986.
13 R. Bacher, “Graphical Interaction and Visualization for the Analysis and Interpretation of Contingency Analysis Results”, Proceedings of IEEE Power Industry Computer Application Conference, 1995, pp. 128-134, May 1995.
14 Shin-Min Hsu, Randy Horton, “Screening Study of Sudden Power Change on Generators due to Transmission Line Re-closing”, IEEE Power Engineering Society General Meeting, pp 1-8, 2007.
15 Liliana Oprea, Victor Popescu, Walter Sattinger, “Coordinated synchronism-check settings for optimal use of critical transmission network corridors”, IEEE Lausanne Power Tech, pp. 167-171, 2007.
16 IEEE Committee Report, “IEEE Screening Guide for Planned Steady-state Switching Operations to Minimize Harmful Effects on Steam Turbine-Generators”, IEEE Transactions on Power Apparatus and Systems, vol. PAS-99, pp. 1519-1521, 1980.   DOI
17 NERC System Protection and Control Subcommittee, “Advantages and Disadvantages of EHV Automatic Reclosing”, December 2009.
18 Ian Gardiner, Joe Monaghan, Dan Hubinette, “Auto-Reclosing and Local System Restoration”, CIGRE Working Group, 2005.
19 A. C. Ammari, L. Pierrat, “Electromagnetic Torque of a Synchronous Machine during a Single Out-of-Phase Reclosing”, European Transactions on Electrical Power, 2000, 10, (4), pp. 213-218.   DOI
20 R. D. Dunlop, S. H. Horwitz, J. S. Joyce and D. Lambrecht, “Torsional Oscillations and Fatigue of Steam Turbine-Generator Shafts Caused by System Disturbances and Switching Events”, CIGRE paper 11-06, presented at the 1980 Session, Paris, August-September 1980.
21 N. Aspragathos, A. D. Dimarogonas, “Fatigue damage of turbine-generator shafts due to fast reclosing”, IEE Proceedings C (Generation, Transmission and Distribution), 1982, 129, (1), pp. 1-9   DOI
22 J. -I. Tsai, “A new single-pole switching technique for suppressing turbine-generator torsional vibrations and enhancing power stability and continuity”, IET Generation, Transmission & Distribution, 2007, 1, (5), pp. 804-810
23 Y. S. Oh, H. C. Seo, C. H. Kim, J. J. Yang, “Development of a Reclosing Scheme for Reduction of Turbine Generator Shaft Torsional Torques: A Decision Method to Achieve Optimal Reactor Capacity”, Journal of Electrical Engineering & Technology, Vol. 9, No. 4, pp. 1145-1153, 2014.   DOI
24 R. C. Dorf and R. H. Bishop, Modern Control Systems, 9th edition, Prentice Hall, Upper Saddle River, 2001.
25 S. M. Yeo, C. H. Kim, “Analysis of Transient Overvoltages within a 345kV Korean Thermal Plant”, Journal of Electrical Engineering & Technology, Vol. 7, No. 3, pp. 297-303, 2012.   DOI
26 H. C. Seo, W. H. Jang, C. H. Kim, Y. H. Chung, D. S. Lee, S. B. Rhee, “Analysis of Magnitude and Rate-of-rise of VFTO in 550kV GIS using EMTP-RV”, Journal of Electrical Engineering & Technology, Vol. 8, No. 121, pp. 11-19, 2013.   DOI
27 IEEE Subsynchronous Resonance Working Group of the Dynamic System Performance Subcommittee, “Second Benchmark Model for Computer Simulation of Subsynchronous Resonance”, IEEE Transactions on Power Apparatus and Systems, Vol. 104, No. 5, pp. 1057-1066, 1985.